Skip to main content
  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexibility Services
    • Green Recovery
    • Transmission Interface
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Innovation
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Partnership Working
    • Northern Powergrid Foundation
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Health and Safety
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Independent Stakeholder Group
    • DSO Review Panel
    • Digitalisation and Action Plan
    • Blogs
  • News
  • Careers

Login

Login to online services

We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

Login Menu
  • Connections
  • Cut Outs
  • Independent Point of Connection
  • Earth Requests
  • Disconnections
  • Moving our Equipment
  • Enquiries
  • Safety Advice
  • SafeDig
  • Shrouding
  • Service Alterations
Northern Powergrid Homepage
  • My power is off
  • New connections
  • Existing connections
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Independent Stakeholder Group
    • Distribution System Operation
    • DSO Review Panel
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Partnership Working
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Northern Powergrid Foundation
    • Open Data Portal
    • New Power Generation
    • Safety
    • Services Directory
    • Smart Metering
    • Transmission interface
    • Weather Aware
  • Power cuts
  • New Connections

    New Connections

    Information

    • Battery Storage
    • EV Charging Points
    • Energy Storage Systems
    • Generation
    • Heat Pumps
    • Independent Point of Connection
    • New Connection
    • Solar Panels
    • Street Furniture (metered)
    • Street Furniture (unmetered)
    • Temporary Connection
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions
  • Existing connections

    Existing Connections

    Information

    • Battery Storage
    • Change Capacity
    • Disconnections
    • Energy Storage Systems
    • EV Charging Points
    • Generation
    • Heat Pumps
    • Move Equipment
    • Solar Panels
    • Street Furniture Changes
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions

    If you are an organisation that installs low carbon technology in residential premises that have an existing connection, you can use ENA Connect Direct. It’s a new, faster way to get approval to connect residential low-carbon technology to the grid.

  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    Login to online services

    We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

    Login Menu
    • Connections
    • Cut Outs
    • Independent Point of Connection
    • Earth Requests
    • Disconnections
    • Moving our Equipment
    • Enquiries
    • Safety Advice
    • SafeDig
    • Shrouding
    • Service Alterations
  • Search
ice-banner-img

Incentive on Connections Engagement

The Incentive on Connections Engagement (ICE) encourages network operators to provide high levels of service for larger connections customers. Each year we publish a detailed work plan of service improvement actions. Our ICE plans are developed together with our connections stakeholders and all our improvement actions are derived from their suggestions and feedback.

Show me the work plan for


Use our online plan to track the progress and status of our ICE actions.

Submit

Click on the green marker for more information on the completed action

To date:
out of actions
are complete
See more

Incentive on Connections Engagement (ICE)

Service improvement work plans

Start of action
Forecast completion
Action completed
Revised completion
Revised timescale
Projected timescale
Area for improvement
Action
Outcome for customers
Target measure
Voltage
Market segments
RAG Status
Q2
AAPR
MMAY
JJUN
Q3
JJUL
AAUG
SSEP
Q4
OOCT
NNOV
DDEC
Q1
JJAN
FFEB
MMAR
Provision of information
Provision of information
We will update our connections contact guide to include regional contacts and signposts to available support and resources.
Stakeholders will have a useful guide that provides contact details for our connections and customer service teams and signposts available support and online resources.
Guide updated and published.
HV
LV
M
U
DG
ICP
Complete
Connections contact guide.

Connections contact guide.

We will update our connections contact guide to include regional contacts and signposts to available support and resources.

Connections contact guide.

Connections contact guide.

We will update our connections contact guide to include regional contacts and signposts to available support and resources.

Connections contact guide.

Connections contact guide.

We will update our connections contact guide to include regional contacts and signposts to available support and resources.

Heat maps
Refresh the data on our generation and demand heat maps on a monthly basis
Up-to-date generation and demand availability heat map data
% of heat map updates performed on a monthly basis
EHV
HV
M
DG
Complete
Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Heat maps

Heat maps

We said we would refresh the data on our generation and demand availability heat maps every month.

Access to network information
We will develop a new process to provide customers who request it with access to more detailed network information.
Customers will have access to more detailed network information and asset records to support and inform their own design activity.
New process implemented
EHV
HV
M
DG
Complete
Access to network information

Access to network information

We will provide customers with access to detailed network information

Access to network information

Access to network information

We will provide customers with access to detailed network information

Access to mains records
We will hold a workshop for connections customers on how to access Northern Powergrid’s mains records.
Customers will understand how to access Northern Powergrid’s mains records.
Workshop held.
All
M
U
DG
Complete
Accessing network records workshop

Accessing network records workshop

We ran workshops for customers to help them better understand how they could access our network records.

Accessing network records workshop

Accessing network records workshop

We ran workshops for customers to help them better understand how they could access our network records.

Heat map data
We will publish data on transmission constraints and mod apps on our heat maps
Stakeholders will be better informed and have access to more timely and accurate data.
Data published as part of the detailed datasheets that accompany our heat maps.
EHV
HV
M
DG
Complete
Additional heat map data

Additional heat map data

We will publish data on transmission constraints and mod apps on our heat maps.

Additional heat map data

Additional heat map data

We will publish data on transmission constraints and mod apps on our heat maps.

EV connections guidance
We updated our guidance for stakeholders seeking EV connections.
Stakeholders seeking connections for EV charging infrastructure will be better informed about our rules and processes.
Guidance updated and published. Webpage updated.
HV
LV
M
U
ICP
Complete
EV connections guidance

EV connections guidance

Stakeholders seeking connections for EV charging infrastructure will be better informed about our rules and processes, and in particular the circumstances by which they can 'connect and notify' and when to make an application that could incur a connection offer expense.

EV connections guidance

EV connections guidance

Stakeholders seeking connections for EV charging infrastructure will be better informed about our rules and processes, and in particular the circumstances by which they can 'connect and notify' and when to make an application that could incur a connection offer expense.

Digital communications
We will trial recording the content of our connections forums and workshops and posting it to the web.
Customers will be able to view content from Northern Powergrid connections events at a time that suits them.
Two connections forums recorded and posted to web by Q2, 2017.
All
M
U
DG
ICP
Complete
Utilising new channels for engagement

Utilising new channels for engagement

We filmed the presentations made our connections events so that customers who were unable to attend could watch at a time that suits them and still benefit from the information shared.

Utilising new channels for engagement

Utilising new channels for engagement

We filmed the presentations made our connections events so that customers who were unable to attend could watch at a time that suits them and still benefit from the information shared.

Connections case studies
We will produce case studies on different HV and EHV connections projects to help customers understand the likely cost and resources required to deliver a specific job
Better understanding of what is required to deliver different types of HV and EHV connections
Case studies available to customers
EHV
HV
M
DG
Complete
Connections case studies

Connections case studies

We said we would produce case studies on different types of HV and EHV connections.

Connections case studies

Connections case studies

We said we would produce case studies on different types of HV and EHV connections.

Provision of information
We will update our unmetered connections guide.
Stakeholders will be better informed about the unmetered connections process, know what to expect and in what timescale and know how to contact us should they need to.
Guide updated and published.
HV
LV
U
Complete
Unmetered connections guide.

Unmetered connections guide.

We updated our guidance for customers seeking unmetered connections.

Unmetered connections guide.

Unmetered connections guide.

We updated our guidance for customers seeking unmetered connections.

Unmetered connections guide.

Unmetered connections guide.

We updated our guidance for customers seeking unmetered connections.

Connections contact guide
We will produce a new guide for customers with contact details for our connections team.
Customers will have access to a useful guide that tells them who to contact about new connections.
Develop and publish guide.
All
M
U
DG
ICP
Complete
Connections contacts guide

Connections contacts guide

We produced a new guide for customers with contact details for our connections engineers.

Connections contacts guide

Connections contacts guide

We produced a new guide for customers with contact details for our connections engineers.

Implementaton of contract milestones
We will produce a simple guide to the implementation of new contract milestones.
Customers will have a guide that explains the new milestones being implemented in Northern Powergrid connections contracts.
Guide produced and published on web.
EHV
HV
M
U
DG
ICP
Complete
Understanding contract milestones

Understanding contract milestones

We developed a simple guide to the implementation of new contract milestones for customers.

Understanding contract milestones

Understanding contract milestones

We developed a simple guide to the implementation of new contract milestones for customers.

Contracted capacity register
We will refresh the data on our contracted capacity register on a monthly basis
Up-to-date generation contracted capacity data
% of monthly updates achieved
EHV
HV
M
DG
Complete
Contracted capacity register

Contracted capacity register

We said we would update our contracted capacity register on a monthly basis.

Contracted capacity register

Contracted capacity register

We said we would update our contracted capacity register on a monthly basis.

Understanding technical terminology
We will develop a jargon buster to help customers understand the technical terminology used in connections
Better understanding of the industry and technical terminology used in connections
Jargon buster available to customers on our website
M
U
DG
ICP
Complete
Understanding connections jargon

Understanding connections jargon

We said we would develop an online jargon buster to help customer understand technical terms and acronyms used in connections.

Understanding connections jargon

Understanding connections jargon

We said we would develop an online jargon buster to help customer understand technical terms and acronyms used in connections.

Provision of information
We will provide training and tutorials on how to use our network availability heat maps and AutoDesign tool.
Stakeholders will be better informed about how to access, use and interpret the data available via these online tools and resources.
Minimum of four training sessions/tutorials held in the ICE plan year.
All
M
DG
ICP
Complete
Training and tutorials

Training and tutorials

We delivered training and developed tutorials on help stakeholders understand how to use our network availability heat maps and AutoDesign and the information that's available through these tools.

Training and tutorials

Training and tutorials

We delivered training and developed tutorials on help stakeholders understand how to use our network availability heat maps and AutoDesign and the information that's available through these tools.

Timescales for protection settings
We will conduct a formal business process review on the provision of protection setting information to our customers, with a view to developing service solutions that close any performance gaps identified.
Implementation of a revised process to provide customers with protection setting information in a more timely manner following the acceptance of a connection offer.
Formal business review completed and revised process implemented where necessary.
HV
M
DG
Complete
Timescales for protection settings

Timescales for protection settings

We developed a new process to ensure we could provide customers with fault level and protection setting data in a more timely manner.

Timescales for protection settings

Timescales for protection settings

We developed a new process to ensure we could provide customers with fault level and protection setting data in a more timely manner.

DG connections guide
We will work with the ENA to update the DG connections guide and incorporate new technologies like storage and export limiting devices.
Customers will have more accurate and up-to-date information on the requirements for connection of distributed energy resources.
Completion of a revised ENA DG connection guide.
All
DG
Complete
DG Connections Guides

DG Connections Guides

We worked with the ENA to update its DG connections guides and to incorporate new technologies like storage and export limiting devices.

DG Connections Guides

DG Connections Guides

We worked with the ENA to update its DG connections guides and to incorporate new technologies like storage and export limiting devices.

DG owner operator forum
We will hold a DG owner operator forum each quarter.
DG customers will have a forum to discuss operational issues and obtain accurate and up-to-date outage information, enabling them to plan more efficiently and strategically.
Four DG owners operator forums held during 2018/19.
EHV
DG
Complete
DG owner operator forum

DG owner operator forum

We will hold a quarterly operational forum for our generation customers.

DG owner operator forum

DG owner operator forum

We will hold a quarterly operational forum for our generation customers.

DG owner operator forum

DG owner operator forum

We will hold a quarterly operational forum for our generation customers.

DG owner operator forum

DG owner operator forum

We will hold a quarterly operational forum for our generation customers.

DG owner operator forum

DG owner operator forum

We will hold a quarterly operational forum for our generation customers.

New Electric Vehicle (EV) connections guide
We will develop and publish a new EV connections guide. We will also review the EV information currently available on our website and make updates and improvements if required.
Stakeholders will have a useful guide on how to apply for different types of EV connections and access to better online information.
Engage with stakeholders to understand their requirements. Develop and publish a new EV connections guide. Review the information on our website and make improvements if required. Add an EV connections FAQ section to our website.
LV
M
U
ICP
Complete
Electric Vehicle (EV) connections guide

Electric Vehicle (EV) connections guide

We developed and published a new EV connections guide. We made improvements to the EV-related information available on our website.

Electric Vehicle (EV) connections guide

Electric Vehicle (EV) connections guide

We developed and published a new EV connections guide. We made improvements to the EV-related information available on our website.

Provision of information
We will develop an end-to-end connections process guide for major works customers.
Stakeholders will be better informed about the connections process, what to expect and in what timescale and know how to contact us should they need to.
Guide developed and published.
All
M
U
DG
ICP
Complete
End-to-end connections process guide.

End-to-end connections process guide.

We developed an end-to-end connections process guide for major works customers.

End-to-end connections process guide.

End-to-end connections process guide.

We developed an end-to-end connections process guide for major works customers.

Engaging with customers with poor power factor
We will engage customers with poor power factor and offer advice on how they can reduce their losses and in turn their electricity costs.
Stakeholders will be better informed about losses and how to reduce their electricity consumption and therefore costs
Identify customers with poor power factor. Briefings held at our engagement events in Q4 2019. Develop and publish an information guide.
EHV
HV
M
Complete
Engaging with customers with poor power factor

Engaging with customers with poor power factor

We identified customers with poor power factor and offered advice on how they can reduce their losses and in turn their electricity costs.

Engaging with customers with poor power factor

Engaging with customers with poor power factor

We identified customers with poor power factor and offered advice on how they can reduce their losses and in turn their electricity costs.

Provision of information
We will make changes to our Get Connected homepage to improve the functionality and usability for customers.
Stakeholders will find it easier to locate and access connections information and services online.
Engage with stakeholders to understand their experience and requirements. Website changes implemented.
All
M
U
DG
ICP
Complete
Get Connected webpage

Get Connected webpage

We made changes to our get connected homepage to improve the functionality and usability for customers.

Get Connected webpage

Get Connected webpage

We made changes to our get connected homepage to improve the functionality and usability for customers.

Guide for Local Authorities and LEPs
We will produce a guide aimed at Local Authorities and LEPs which signposts the support and tools we make available
Stakeholders will have a useful reference that signposts the help, support and online tools we make available to those seeking a new connection to our network.
New guide developed and published. Guide issued to all Local Authorities and LEPs in our region.
All
M
U
Complete
Guide for Local Authorities and LEPs

Guide for Local Authorities and LEPs

We produced a guide aimed at Local Authorities and LEPs which signposts the support and tools we make available.

Guide for Local Authorities and LEPs

Guide for Local Authorities and LEPs

We produced a guide aimed at Local Authorities and LEPs which signposts the support and tools we make available.

Training for heat map users
We will deliver training on our network availability heat maps for users.
Stakeholders will be better informed about how to use our heat maps and the network information available. They will also have opportunities to provide feedback to help inform any future developments.
Deliver a heat map training webinar. Create a ‘how to’ guide for heat map users.
EHV
HV
M
DG
Complete
Heat map training

Heat map training

We delivered training on our network availability heat maps for users.

Heat map training

Heat map training

We delivered training on our network availability heat maps for users.

Contracted capacity register
We will create a new contracted capacity register webpage that features an archive of previous registers in excel and pdf format
Customers will have access to historical information in the formats they require.
Webpage live and information available.
EHV
DG
Complete
Contracted capacity register webpage

Contracted capacity register webpage

Following feedback we created a new contracted capacity register webpage that features an archive of previous registers in both Excel and PDF formats.

Contracted capacity register webpage

Contracted capacity register webpage

Following feedback we created a new contracted capacity register webpage that features an archive of previous registers in both Excel and PDF formats.

Stakeholder updates
We will ensure customers are kept informed of the progress of our ICE work plan actions with regular stakeholder updates and by developing the ICE section of our website
Better information available for our customers
Web page usage and stakeholder surveys
All
M
U
DG
ICP
Complete
Stakeholder updates

Stakeholder updates

We said we would ensure our connections stakeholders were kept informed of the service improvements we are making.

Stakeholder updates

Stakeholder updates

We said we would ensure our connections stakeholders were kept informed of the service improvements we are making.

Social media
We will trial social media ‘Ask the Expert’ Q&A sessions on topics identfed by our connections customers
Customers will have access to Northern Powergrid subject experts and will be able to pose questions and receive answers in real-time.
Four social media Q&A sessions held, one per quarter.
All
M
U
DG
ICP
Complete
Social media 'Ask the Expert' Q&A's

Social media 'Ask the Expert' Q&A's

We made our experts more accessible by running Q&A sessions on social media.

Social media 'Ask the Expert' Q&A's

Social media 'Ask the Expert' Q&A's

We made our experts more accessible by running Q&A sessions on social media.

Social media 'Ask the Expert' Q&A's

Social media 'Ask the Expert' Q&A's

We made our experts more accessible by running Q&A sessions on social media.

Social media 'Ask the Expert' Q&A's

Social media 'Ask the Expert' Q&A's

We made our experts more accessible by running Q&A sessions on social media.

SafeDig
We will inform stakeholders about the launch of our new SafeDig webpage and provide briefings and training for users.
Stakeholders will be better informed about our new SafeDig system and its benefits and have access to an automated and more user-friendly system.
Issue a communication to SafeDig users regarding the launch of the new webpage. Hold briefings at our Connections Customer Forums and ICP Seminars. Hold a ‘how to’ training session on the new SafeDig system.
All
M
U
DG
ICP
Complete
SafeDig

SafeDig

We informed stakeholders about the launch of our new SafeDig service and provided briefings and training for users.

SafeDig

SafeDig

We informed stakeholders about the launch of our new SafeDig service and provided briefings and training for users.

Provision of information on wayleaves
We will publish quarterly wayleaves and easements performance statistics
Better visibility on the time taken for Northern Powergrid to obtain wayleaves and easements
Publication of quarterly performance statistics
EHV
HV
M
DG
Complete
Provision of information on wayleaves

Provision of information on wayleaves

We said we would publish wayleaves and easements performance data every quarter.

Provision of information on wayleaves

Provision of information on wayleaves

We said we would publish wayleaves and easements performance data every quarter.

Provision of information on wayleaves

Provision of information on wayleaves

We said we would publish wayleaves and easements performance data every quarter.

Provision of information on wayleaves

Provision of information on wayleaves

We said we would publish wayleaves and easements performance data every quarter.

Providing timely and accurate information for generators on planned outages
We will develop and run a trial with generators to provide more timely and accurate information on planned outages.
Stakeholders will be better informed about network constraints and any planned outages affecting their assets.
Trial participants identified. Trial developed and implemented. Next steps agreed with stakeholders
EHV
HV
DG
Complete
Providing timely and accurate information for generators on planned outages

Providing timely and accurate information for generators on planned outages

We will develop and run a trial with generators to provide more timely and accurate information on planned outages.

Providing timely and accurate information for generators on planned outages

Providing timely and accurate information for generators on planned outages

We will develop and run a trial with generators to provide more timely and accurate information on planned outages.

Network information
We will develop a new process to provide customers who request it with access to network information in KMZ and GIS formats.
Customers will have better access and the ability to work with our network data.
New process implemented.
EHV
HV
M
DG
ICP
Complete
Network information

Network information

We will provide our network data in KMZ and GIS formats for customers who request it.

Network information

Network information

We will provide our network data in KMZ and GIS formats for customers who request it.

Network data sources
We published information on different network data sources and platforms we make available, including how to access them.
Stakeholders will know what data is available, in what format and how to access it.
New webpage developed and published.
All
M
U
DG
ICP
Complete
Network data sources

Network data sources

We published information on different network data sources and platforms we make available, including how to access them.

Network data sources

Network data sources

We published information on different network data sources and platforms we make available, including how to access them.

Network data requests
We formalised the process whereby stakeholders can request network data and information.
Stakeholders will receive a more timely and efficient response to requests for data to help them perform their own upfront assessments.
Engage with stakeholders to understand their experience and expectations. New process developed and published.
All
M
U
DG
ICP
Complete
Network data requests

Network data requests

We formalised a process whereby stakeholders can request network data and information.

Network data requests

Network data requests

We formalised a process whereby stakeholders can request network data and information.

Known network constraints
We published details of any known constraints on the transmission and distribution networks on our network availability heat maps.
Stakeholders will have better visibility and be able to make more informed choices about how, where and when to connect.
Information published and reviewed on a quarterly basis.
EHV
HV
M
DG
Complete
Known network constraints

Known network constraints

We published details of any known constraints on the transmission and distribution networks on our network availability heat maps.

Known network constraints

Known network constraints

We published details of any known constraints on the transmission and distribution networks on our network availability heat maps.

Improving our application and delivery process
Converting budget estimates into firm quotations
We will improve how we issue budget estimates to make it quicker and easier for customers to proceed to a firm quotation
Making it quicker and easier for customers to proceed from estimate to a firm quotation
Implementation of a new process
All
M
U
DG
Complete
Converting a budget estimate into a firm quotation

Converting a budget estimate into a firm quotation

We said we would improve how we issue budget estimates to make it quicker and easier to proceed to a firm quotation

Converting a budget estimate into a firm quotation

Converting a budget estimate into a firm quotation

We said we would improve how we issue budget estimates to make it quicker and easier to proceed to a firm quotation

Converting a budget estimate into a firm quotation

Converting a budget estimate into a firm quotation

We said we would improve how we issue budget estimates to make it quicker and easier to proceed to a firm quotation

Multi-optioneering application service
We will create a new page on our website that promotes our multi-optioneering service and explains the process to customers.
Customers will be made aware of the multi-optioneering service available to them and given a better understanding of the process and how to access it.
New web page available online.
EHV
HV
M
DG
Complete
Multi-optioneering design service

Multi-optioneering design service

We created a new page on our website to promote the multiple application optioneering service we offer.

Multi-optioneering design service

Multi-optioneering design service

We created a new page on our website to promote the multiple application optioneering service we offer.

Stakeholders will be better informed and find it quicker and easier to make applications for different types of LCTs.
We will make changes to our online application process to make it easier to apply to install different types of LCTs.
Stakeholders will be better informed and find it quicker and easier to make applications for different types of LCTs.
Engage with stakeholders to understand their experience and requirements. Make improvements to our online application process as required.
All
M
U
DG
ICP
Complete
Connections process for Low Carbon Technologies

Connections process for Low Carbon Technologies

We will make changes to our online application process to make it easier to apply to install different types of Low Carbon Technologies (LCTs).

Connections process for Low Carbon Technologies

Connections process for Low Carbon Technologies

We will make changes to our online application process to make it easier to apply to install different types of Low Carbon Technologies (LCTs).

Developing our budget estimating tool
We will engage with stakeholders and seek feedback to develop our budget estimating tool.
Stakeholders will have opportunities to contribute to the continued development of our budget estimating tool and to help inform future use cases and the tool’s functionality.
Engage with stakeholders to understand their requirements. Feedback used to help inform future use cases and development of the tool.
LV
M
U
DG
ICP
Complete
Developing our budget estimating tool

Developing our budget estimating tool

We engaged with stakeholders and seek feedback to develop our budget estimating tool

Developing our budget estimating tool

Developing our budget estimating tool

We engaged with stakeholders and seek feedback to develop our budget estimating tool

Find my MPAN online service
We will benchmark our fnd my MPAN online service against other DNOs and make improvements as required.
Customers will be able to locate MPANs more quickly and will have more accurate information.
System benchmarked and improvements made if necessary.
All
M
U
Complete
Who's my supplier?

Who's my supplier?

Following feedback we benchmarked our online 'who's my supplier?' service against other DNOs offerings.

Who's my supplier?

Who's my supplier?

Following feedback we benchmarked our online 'who's my supplier?' service against other DNOs offerings.

Updates on our connections offers
We will provide customers with an update on the progress of their connection quotation midway through its preparation, where a 65-day guaranteed standard applies.
Customers will be better informed on the status and timescales of their expected offer.
Feedback being delivered.
EHV
HV
M
DG
Complete
Updates on the status of connections offers

Updates on the status of connections offers

We now provide customers with an update on the progress of their quotation mid-way through its preparation where a 65-day guaranteed standard applies.

Connection offer expiry dates
We will include the actual date on which the offer expires in each quotation we issue.
Customers will have firm confirmation of the date their quotations expire.
All new quotations will include the expiry date of the offer.
All
M
U
DG
ICP
Complete
Connection offer expiry dates

Connection offer expiry dates

We now provide the exact date when the offer will expire on every new quotation we issue.

Connection offer expiry dates

Connection offer expiry dates

We now provide the exact date when the offer will expire on every new quotation we issue.

Contact information for connection engineers
We will create a new web page where customers can find the contact details for our regional connections engineers.
Customers will be able to access the contact details of our connections engineers quickly and easily.
New web page created and published on our website.
All
M
U
DG
ICP
Complete
Contact information for our business development team

Contact information for our business development team

We published contact details for our regional connections engineers on our website so that customers could access them more easily.

Contact information for our business development team

Contact information for our business development team

We published contact details for our regional connections engineers on our website so that customers could access them more easily.

Distributed generation connectons
We will create a quick cost calculator for generation connection applications and make it available on our website
Customers will be able to obtain an upfront, indicative cost for their generation connection.
Generation calculator available online.
HV
LV
DG
Complete
Distributed generation quick cost calculator

Distributed generation quick cost calculator

We developed a quick cost calculator for generation connection applications and made it available on our website.

Distributed generation quick cost calculator

Distributed generation quick cost calculator

We developed a quick cost calculator for generation connection applications and made it available on our website.

EHV quotations
We will add a front page summary to EHV quotations.
Customers will be able to see all key information contained in their offer at a glance.
Summary front page added to all EHV quotations.
EHV
M
DG
Complete
EHV quotations

EHV quotations

Following feedback we added a summary front page featuring key information presented in the offer to all our EHV quotations.

EHV quotations

EHV quotations

Following feedback we added a summary front page featuring key information presented in the offer to all our EHV quotations.

Applying for a temporary site supply
We will implement changes to our application process that make it easier for customers to apply for a separate temporary site supply
Making it easier to apply for a temporary site connection
% of temporary connections applied for using the new process
All
M
DG
ICP
Complete
Temporary site supply

Temporary site supply

We said we would make it easier for customers to apply for a temporary site connection.

Temporary site supply

Temporary site supply

We said we would make it easier for customers to apply for a temporary site connection.

Temporary site supply

Temporary site supply

We said we would make it easier for customers to apply for a temporary site connection.

Storage applications
We will modify the G59 application form on our website to include an option to connect energy storage.
Customers will have a quick and easy method of applying for an energy storage connecton online.
G59 form modified and new option available, number of applications made using the new process.
All
DG
Complete
G59 storage applications

G59 storage applications

We modified our online G59 application form to include an option to connect energy storage.

G59 storage applications

G59 storage applications

We modified our online G59 application form to include an option to connect energy storage.

ICP design approvals
We will review of our ICP design approval process and make any necessary changes to ensure we can provide clearer and more timely responses to ICP submissions
Clear and timely approval of ICP design submissions
% reduction in approval time under new process
All
M
U
DG
ICP
Complete
ICP design approvals

ICP design approvals

We reviewed our design approvals process for Independent Connections Providers.

ICP design approvals

ICP design approvals

We reviewed our design approvals process for Independent Connections Providers.

Transmission/Distribution (T/D) interface
We will support the national working party on transmission processes and adopt best practice process outcomes
Improved communication on transmission issues and support for customers through the process
Progress communicated, new processes and policies implemented
EHV
M
DG
Complete
T/D interface

T/D interface

We said we would support the national working party on transmission processes and adopt any best practice process outcomes or recommendations

T/D interface

T/D interface

We said we would support the national working party on transmission processes and adopt any best practice process outcomes or recommendations

ICP quotations
We will implement a new process whereby ICPs will benefit from faster quotes for sites where we have already issued a quotation
Quicker quotations
% reduction in time to quote under new process
EHV
HV
M
DG
ICP
Complete
ICP quotations

ICP quotations

We said we would implement a new process so that ICPs receive quotes quicker for sites where a quotation has already been issued.

ICP quotations

ICP quotations

We said we would implement a new process so that ICPs receive quotes quicker for sites where a quotation has already been issued.

Streamlining our application process
We will work with customers who make multiple, repeat applications to streamline our applications process.
Customers who submit multiple, repeat applications on behalf of themselves or a third party will find it quicker and easier to make new connections applications.
New process developed and implemented. Customers who are potentially affected identified and notified.
All
M
U
ICP
Complete
Streamlining our application process

Streamlining our application process

We will work with customers who make multiple, repeat applications to streamline our applications process.

Streamlining our application process

Streamlining our application process

We will work with customers who make multiple, repeat applications to streamline our applications process.

Improved customer communications
We will include a description of the connection project as well as the enquiry reference, at the beginning of all our customer correspondences.
Customers with multiple connections will be able to identify the project we are referring to quickly and easily.
Customer correspondence reviewed and new standards applied.
All
M
U
DG
Complete
Improved customer communications

Improved customer communications

We will include a description of the connection project as well as the enquiry reference at the beginning of all our customer correspondences.

Improved customer communications

Improved customer communications

We will include a description of the connection project as well as the enquiry reference at the beginning of all our customer correspondences.

Improved customer communications

Improved customer communications

We will include a description of the connection project as well as the enquiry reference at the beginning of all our customer correspondences.

ICP design approvals
We will publish approved standard templates for 11kV, 20kV and 33kV connections for use by ICPs in their designs
Quicker approval of schemes designed by ICPs
% of ICPs using new standard templates
EHV
HV
M
DG
ICP
Complete
Standard design templates for ICPs

Standard design templates for ICPs

We said we publish approved standard design templates for use by ICPs in their designs.

Standard design templates for ICPs

Standard design templates for ICPs

We said we publish approved standard design templates for use by ICPs in their designs.

Self-service budget tool
We will mobilise a project to build a self-service budget tool and keep our customers informed and involved.
Customers will have the opportunity to influence and contribute to the development of a new tool.
Project mobilised and customers engaged.
LV
M
DG
Complete
Self-service LV budget estimating tool

Self-service LV budget estimating tool

We will develop a self-service LV budget tool with input from our customers.

Self-service LV budget estimating tool

Self-service LV budget estimating tool

We will develop a self-service LV budget tool with input from our customers.

Re-connection of knocked down street lighting
We will run a pilot with a Local Authority to reconnect knocked down streetlighting within 10 working days from receipt of notification that the new column has been erected. Post-pilot, we will consider how to roll this out to other Local Authorities in our region
Faster reconnection of knocked down street lighting and a better service delivered to Local Authorities and members of the public
% decrease in working days taken to reconnect knocked down street lighting
LV
U
Complete
Public street lighting

Public street lighting

We said we would run a pilot with a Local Authority to reconnect knocked down street lights within a target of 10-working days.

Public street lighting

Public street lighting

We said we would run a pilot with a Local Authority to reconnect knocked down street lights within a target of 10-working days.

Pre-application surgeries for planners and developers
We will offer free pre-application surgeries for developers, Local Authority planners and consultants to help them identify the optimum and most costeffective connections solutions.
Stakeholders considering new builds and significant developments will be able to access local, specialist knowledge and advice. We will work together to identify the most viable and cost-effective connections solution
Notify all Local Authorities and LEPs in our region about the new service we are making available to them. Identify developers and consultants active in our region and ensure they are also aware of the service we can offer.
All
M
U
DG
ICP
Complete
Pre-application surgeries for planners and developers

Pre-application surgeries for planners and developers

We will offer free pre-application surgeries for developers, Local Authority planners and consultants to help them identify the optimum and most cost-effective connections solutions.

Pre-application surgeries for planners and developers

Pre-application surgeries for planners and developers

We will offer free pre-application surgeries for developers, Local Authority planners and consultants to help them identify the optimum and most cost-effective connections solutions.

LV budget estimating tool
We will develop and deploy a new LV self-serve budget estimating tool.
Users will have access to a new automated tool that will allow them to self-serve and generate their own LV budget estimates.
New tool developed and deployed.
LV
M
U
DG
ICP
Complete
New LV budget estimating tool

New LV budget estimating tool

We engaged with stakeholders to develop and deploy our new LV self-serve budget estimating tool which we called AutoDesign.

New LV budget estimating tool

New LV budget estimating tool

We engaged with stakeholders to develop and deploy our new LV self-serve budget estimating tool which we called AutoDesign.

Network constraints
We will ensure stakeholders with proposed or existing connections affected by known constraints on the transmission and distribution networks will receive better and more timely communication.
Stakeholders will be better informed about the likely impact on their project’s timescales and cost and be able to engage with us on this important issue.
Engage with stakeholders to understand their expectations and requirements. Review our processes and make necessary changes.
EHV
M
DG
Complete
Network constraints

Network constraints

We reviewed our current process and made the improvements as necessary, to ensure any stakeholders with proposed or existing connections affected by known constraints on the transmission and distribution networks will receive better and more timely communication.

Network constraints

Network constraints

We reviewed our current process and made the improvements as necessary, to ensure any stakeholders with proposed or existing connections affected by known constraints on the transmission and distribution networks will receive better and more timely communication.

Improving our application and delivery processes
We will provide information on different types of connections including G98/99 and flexible arrangements and on the connection charging regulations.
Stakeholders will be better informed about the different types of connections available, how to apply and the implications of accepting different types of offers. They will have a better understanding of the connections charging regulations.
Guidance developed and published.
All
M
DG
ICP
Complete
Information on different types of connections

Information on different types of connections

We will provide information on different types of connections, including G98/99 and flexible arrangements and on the connections charges regulations.

Information on different types of connections

Information on different types of connections

We will provide information on different types of connections, including G98/99 and flexible arrangements and on the connections charges regulations.

Improving our communication and engagement
Connections surgeries
We will engage with stakeholders to understand what we could do to improve their connections surgery experience.
Stakeholders will have the opportunity to give feedback and help shape our proposition.
Engage with stakeholders to seek their feedback. Review how we promote and deliver our surgeries and make improvements if necessary. Trial 'virtual' surgeries. Introduce a new process to survey satisfaction of stakeholders attending our surgeries.
All
M
U
DG
ICP
Complete
Connections surgeries

Connections surgeries

We engaged with stakeholders to understand how we could improve their connections surgery experience.

Connections surgeries

Connections surgeries

We engaged with stakeholders to understand how we could improve their connections surgery experience.

Connections surgeries

Connections surgeries

We engaged with stakeholders to understand how we could improve their connections surgery experience.

Connections 101 sessions
We hosted 'connections 101' sessions to introduce stakeholders to our connections business.
Stakeholders will receive a comprehensive introduction and overview to our end-to-end connections process and understand our role and responsibilities and a network operator and connections provider.
Minimum of two 'connections 101' engagement sessions held.
All
M
U
DG
ICP
Complete
Connections 101 sessions

Connections 101 sessions

We hosted 'connections 101' sessions to introduce stakeholders to our connections business. The sessions will be aimed at stakeholders who are new or unfamiliar with our policies and practices and will explain the end-to-end process and what stakeholders can expect.

Connections 101 sessions

Connections 101 sessions

We hosted 'connections 101' sessions to introduce stakeholders to our connections business. The sessions will be aimed at stakeholders who are new or unfamiliar with our policies and practices and will explain the end-to-end process and what stakeholders can expect.

Engaging with connections stakeholders
We worked with stakeholders to develop and agree our connections engagement strategy to ensure it meets their needs.
Stakeholders will have the opportunity to inform and shape our future engagement strategy. They will clearly understand how their feedback drives change in our business and helps us to improve the connections service we provide.
Engage with stakeholders to understand their expectations and requirements. Review our current strategy, learning from best practice and successful initiatives and activities.
All
M
U
DG
ICP
Complete
Engaging with connections stakeholders

Engaging with connections stakeholders

We worked with stakeholders to develop and agree our connections engagement strategy to ensure it meets their needs.

Engaging with connections stakeholders

Engaging with connections stakeholders

We worked with stakeholders to develop and agree our connections engagement strategy to ensure it meets their needs.

Customers who connect through a third party
We will engage with stakeholders who use a contractor to procure multiple connections and seek feedback from those stakeholders on our service.
Customers who use a contractor to procure multiple connections on their behalf will have the opportunity to give feedback and help shape our service improvement plans.
Identify customers who use a third party to procure their connections. Contact identified customers to seek feedback on our service
All
M
U
DG
Complete
Customers who connect through a third party.

Customers who connect through a third party.

We identified customers who procure connections via a third party and contacted them to seek feedback on our service.

Customers who connect through a third party.

Customers who connect through a third party.

We identified customers who procure connections via a third party and contacted them to seek feedback on our service.

Hard to reach connections stakeholders
We will hold dedicated engagements for hard to reach stakeholders with specific connection needs including NFU members, Community Energy groups and off-grid customers.
Stakeholders will be better informed about our connections processes and can engage with our experts. We will be able to better understand their specific needs and help them get connected in a quicker and more efficient way.
Two dedicated stakeholder engagement sessions delivered in 2018/19.
All
M
DG
Complete
Hard to reach stakeholders

Hard to reach stakeholders

We will hold dedicated engagement sessions for 'hard to reach' stakeholders and customers with specific connections needs.

Hard to reach stakeholders

Hard to reach stakeholders

We will hold dedicated engagement sessions for 'hard to reach' stakeholders and customers with specific connections needs.

Connections workshops
We will hold targeted workshops on emerging connections topics suggested by our customers.
Customers will be able to shape our workshop programme and gain access to Northern Powergrid subject experts.
Four targeted workshops held, one per quarter.
All
M
U
DG
ICP
Complete
Targeted workshops

Targeted workshops

We held four targeted workshops on emerging connections topics suggested by our customers.

Targeted workshops

Targeted workshops

We held four targeted workshops on emerging connections topics suggested by our customers.

Targeted workshops

Targeted workshops

We held four targeted workshops on emerging connections topics suggested by our customers.

Targeted workshops

Targeted workshops

We held four targeted workshops on emerging connections topics suggested by our customers.

Targeted workshops

Targeted workshops

We held four targeted workshops on emerging connections topics suggested by our customers.

IDNO engagement
We will host a connections forum for Independent Distribution Network Operators (IDNOs)
IDNO stakeholders will have a forum to engage with us on the issues that are important to them and their customers.
Deliver a IDNO connections forum in the 2020/21 ICE plan year
All
ICP
Complete
IDNO connections forum

IDNO connections forum

We hosted a forum for Independent Distribution Network Operators (IDNOs)

IDNO connections forum

IDNO connections forum

We hosted a forum for Independent Distribution Network Operators (IDNOs)

Support for Community Energy groups and stakeholders
We will provide support for Community Energy groups and stakeholders seeking a new connection to our network.
Community Energy groups and stakeholders will have access to specialist advice and will be better supported when seeking a new connection to our network.
Create a dedicated CE section on our website. Provide information on available technical support and advice and free online tools. Create a connections FAQ factsheet. Minimum of two engagement sessions held in the year.
LV
DG
Complete
Support for Community Energy groups and stakeholders

Support for Community Energy groups and stakeholders

We will provide support for Community Energy groups and stakeholders seeking a new connection to our network.

Single points of contact
We will provide single points of contact in quotation and delivery for all connections customers
Single points of contact in quotations and delivery for all customers
% of customers issued with single points of contact
All
M
U
DG
Complete
Single points of contacts for customers

Single points of contacts for customers

We said we would provide single points of contact in quotations and delivery for all our connections customers.

Single points of contacts for customers

Single points of contacts for customers

We said we would provide single points of contact in quotations and delivery for all our connections customers.

Pre-application support
We engaged with stakeholders and used their feedback to inform our pre-application support and advice proposition.
Stakeholders will receive better upfront advice and support and can explore their options before making an application.
Engage with stakeholders to understand their expectation and requirements. Review and develop our proposition, learning from best practice.
All
M
U
DG
ICP
Complete
Pre-application support

Pre-application support

We engaged with stakeholders in order to review our pre-application support and advice proposition.

Pre-application support

Pre-application support

We engaged with stakeholders in order to review our pre-application support and advice proposition.

More targeted communications
We will create a new web based process to enable customers to register as an interested stakeholder by connections customer type.
We will be able to deliver more targeted communications and engagement, tailored to different types of connections customers.
Web form created and published on our website.
All
M
U
DG
ICP
Complete
More targeted communications

More targeted communications

We created a simple online registration form that connections stakeholders can use to tell us more about the kind of information they want to receive from us. This information will enable us to deliver more targeted communications and engagement.

More targeted communications

More targeted communications

We created a simple online registration form that connections stakeholders can use to tell us more about the kind of information they want to receive from us. This information will enable us to deliver more targeted communications and engagement.

Improving our communication and engagement
We will host regular engagement sessions with Local Authorities to support their pipeline of connections projects and discuss their long term strategic development plans
Local Authority stakeholders will have a channel to discuss their immediate connections requirements and longer term strategic plans.
Invitations issued to all Local Authorities in our region. Minimum of four engagement sessions held.
All
M
U
DG
Complete
Local Authority engagement

Local Authority engagement

We hosted regular engagement sessions with Local Authorities to support their pipeline of connections projects and discuss their long term plans.

Local Authority engagement

Local Authority engagement

We hosted regular engagement sessions with Local Authorities to support their pipeline of connections projects and discuss their long term plans.

Local energy planning forums
We will host local energy planning forums for local government and other interested stakeholders
Stakeholders can come together to explore future priorities and any emerging challenges. They will have opportunities to shape the content of these sessions and be better informed about the help and support we provide.
Three forums delivered during the 2020/21 ICE plan year.
All
M
U
DG
ICP
Complete
Local energy planning forums

Local energy planning forums

We will host local energy planning forums for local government and other interested stakeholders.

Local energy planning forums

Local energy planning forums

We will host local energy planning forums for local government and other interested stakeholders.

Local energy planning forums

Local energy planning forums

We will host local energy planning forums for local government and other interested stakeholders.

Local government forums
We will deliver a series of connections forums aimed at Local Authorities where they can come together to discuss emerging connections issues and access specialist advice.
Local Authorities will have a forum where they can explore common approaches to emerging connections topics. They will have a better understanding of how to engage with us and have access to specialist advice and support.
Three Local Authority forums delivered in the 2019/20 ICE plan year.
All
M
U
DG
ICP
Complete
Local government forums

Local government forums

We delivered a series of forums aimed at Local Authority representatives where these stakeholders can come together to explore emerging connections topics and access advice.

Local government forums

Local government forums

We delivered a series of forums aimed at Local Authority representatives where these stakeholders can come together to explore emerging connections topics and access advice.

Local government forums

Local government forums

We delivered a series of forums aimed at Local Authority representatives where these stakeholders can come together to explore emerging connections topics and access advice.

Technical and commercial developments
Undergrounding of networks in areas of outstanding natural beauty (AONB)
We will engage in a discussion with Ofgem on behalf of our stakeholders on the treatment of the costs for undergrounding of rural network in AONB.
Improved visual impact of the distribution network in AONB whilst optimising the use of the ED1 allowance to carry out such works.
Discussion held with Ofgem on whether AONB ED1 allowances can be incorporated into the provision of connections.
All
M
U
DG
ICP
Complete
Undergrounding of networks in AONB

Undergrounding of networks in AONB

We engaged in a discussion with Ofgem on behalf of our stakeholders on the treatment of costs for undergrounding of rural networks in Areas of Natural Beauty (AONB).

Undergrounding of networks in AONB

Undergrounding of networks in AONB

We engaged in a discussion with Ofgem on behalf of our stakeholders on the treatment of costs for undergrounding of rural networks in Areas of Natural Beauty (AONB).

Accelerated Loss of Mains Change Programme
We will establish a local working group for stakeholders involved in the ENA’s Accelerated Loss of Mains Change Programme
Stakeholders will have a channel to give feedback and seek clarity on the process and, if necessary, can use us as an advocate to work on their behalf and share their issues with the national working group.
Quarterly meetings held. Stakeholder updates delivered.
All
DG
Complete
Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

We will establish a local working group for stakeholders involved in the ENA’s Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

We will establish a local working group for stakeholders involved in the ENA’s Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

We will establish a local working group for stakeholders involved in the ENA’s Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

Accelerated Loss of Mains Change Programme.

We will establish a local working group for stakeholders involved in the ENA’s Accelerated Loss of Mains Change Programme.

Technical and commercial developments
We will engage with stakeholders on our Connection Offer Expenses (COE).
Stakeholders will be better informed about our COE including how, why and when they are applied..
Stakeholder updates delivered. CoE guide and webpage updated.
All
M
U
DG
ICP
Complete
Connections Offer Expenses

Connections Offer Expenses

We will engage with stakeholders on Connection Offer Expenses (COE).

Connections Offer Expenses

Connections Offer Expenses

We will engage with stakeholders on Connection Offer Expenses (COE).

We will engage with stakeholders on the electrification of heating and our role in the low carbon transition
We will engage with stakeholders on the electrification of heating and our role in the low carbon transition.
Stakeholders will be better informed about the steps we are taking to support the electrification of heating in our region.
Minimum of two engagement sessions held in the 2020/21 ICE plan year.
All
M
U
DG
ICP
Complete
Electrification of heating

Electrification of heating

We will engage with stakeholders on the electrification of heating and our role in the low carbon transition.

Electrification of heating

Electrification of heating

We will engage with stakeholders on the electrification of heating and our role in the low carbon transition.

Engaging with installers of Low Carbon Technologies (LCTs)
We will engage with installers of LCTs to understand their priorities, challenges and how we can best support them.
Stakeholders will have opportunities to provide feedback on our connections process and how we can best support them. We will signpost available support and free online tools that can help them when seeking a connection to our network
Stakeholders identified and feedback sought. Minimum of two engagement sessions held in the 2020/21 ICE plan year.
LV
M
U
DG
Complete
Engaging with installers of Low Carbon Technologies

Engaging with installers of Low Carbon Technologies

We will engage with installers of Low Carbon Technologies to better understand their priorities, any challenges they are facing and how we can best support them.

Engaging with installers of Low Carbon Technologies

Engaging with installers of Low Carbon Technologies

We will engage with installers of Low Carbon Technologies to better understand their priorities, any challenges they are facing and how we can best support them.

We will continue to engage with stakeholders about the actions we are taking to support the roll-out of Electric Vehicles (EVs) in our region and on our role in the low carbon transition
We will continue to engage with stakeholders about the actions we are taking to support the roll-out of Electric Vehicles (EVs) in our region and on our role in the low carbon transition.
Stakeholders will will be better informed about the actions we are taking to support the electrification of transport in our region.
Minimum of two engagement sessions held in the 2020/21 ICE plan year.
All
M
U
DG
ICP
Complete
Engaging with stakeholders on the electrification of transport

Engaging with stakeholders on the electrification of transport

We will continue to engage with stakeholders about the actions we are taking to support the roll-out of Electric Vehicles in our region and on our role in the low carbon transition.

Engaging with stakeholders on the electrification of transport

Engaging with stakeholders on the electrification of transport

We will continue to engage with stakeholders about the actions we are taking to support the roll-out of Electric Vehicles in our region and on our role in the low carbon transition.

Active Network Management (ANM) and future solutions
We will continue to engage with stakeholders about our ANM strategy including how, where and when we will be deploying future flexible solutions.
Customers will be better informed about our strategy for flexible connection solutions including how, where and when we propose to roll-out those solutions.
Progress communicated.
EHV
HV
DG
Complete
Active Network Management (ANM) and future roll-out

Active Network Management (ANM) and future roll-out

We will continue to engage with stakeholders on our strategy and roll-out of ANM and future solutions.

Active Network Management (ANM) and future roll-out

Active Network Management (ANM) and future roll-out

We will continue to engage with stakeholders on our strategy and roll-out of ANM and future solutions.

Assessment and design (A&D) fees
We will continue to support and actively engage in the national consultation on A&D fees and keep our customers informed of the developments. We will implement any necessary changes to our policies and processes following the outcome of the consultation
A revised approach to A&D fees
Progress reported, new policy and processes implemented
All
M
DG
Complete
Assessment & Design (A&D) fees

Assessment & Design (A&D) fees

We said we would We will continue to support and actively engage in the national debate on A&D fees and keep our customers informed of any developments.

Assessment & Design (A&D) fees

Assessment & Design (A&D) fees

We said we would We will continue to support and actively engage in the national debate on A&D fees and keep our customers informed of any developments.

Assessment and Design (A&D) fees
We will continue to contribute to the national debate on A&D fees and keep our customers informed of the outcomes. On conclusion of the BEIS consultaton, we will implement any changes to our existing policies or practices required and communicate these to our customers.
Customers will be kept informed on the outcome of the national A&D fees debate. We will revise our approach to A&D fees as necessary.
Progress reported and new policy and processes implemented as necessary.
All
M
DG
Complete
Assessment and Design (A&D) fees

Assessment and Design (A&D) fees

We continued to support and contribute to the national debate on the introduction of A&D fees and keep our customers informed of the outcomes. On conclusion of the industry-wide consultation, we implemented changes to our existing policies or practices and communicated these to our customers.

Assessment and Design (A&D) fees

Assessment and Design (A&D) fees

We continued to support and contribute to the national debate on the introduction of A&D fees and keep our customers informed of the outcomes. On conclusion of the industry-wide consultation, we implemented changes to our existing policies or practices and communicated these to our customers.

Contract milestones
We will implement standard contract milestones to clawback unused capacity after a maximum build-out period
Ability for DNOs to release unused network capacity
Build-out time limit implemented in all (100%) of Northern Powergrid contracts
All
M
DG
Complete
Clawback of capacity after a maximum build-out period

Clawback of capacity after a maximum build-out period

We will implement standard contract milestones regarding clawback of unused capacity after a maximum build-out period.

Clawback of capacity after a maximum build-out period

Clawback of capacity after a maximum build-out period

We will implement standard contract milestones regarding clawback of unused capacity after a maximum build-out period.

Connecting new and innovative technologies
We will run a technical workshop for stakeholders exploring all aspects of connecting storage, ANM, export limiting devices and other technical innovations
Better understanding of the technical principles involved in connecting new technologies
Workshop delivered, number of attendees and overall satisfaction scor
EHV
HV
M
DG
Complete
Connecting innovative technologies

Connecting innovative technologies

We said we would run a technical workshop on connecting new and innovative technologies.

Connecting innovative technologies

Connecting innovative technologies

We said we would run a technical workshop on connecting new and innovative technologies.

Updates on Statement of Works process and Appendix G
We will provide updates on developments in the Statement of Works process and progress of the Appendix G trials.
Stakeholders will be better informed about how we manage new connections that are affected by the Transmission network.
Briefings held at our Connections Customer Forums and ICP Seminars.
EHV
HV
M
DG
Complete
Updates on Statement of Works process and Appendix G

Updates on Statement of Works process and Appendix G

We will provide updates on developments in the Statement of Works process and Appendix G trials.

Updates on Statement of Works process and Appendix G

Updates on Statement of Works process and Appendix G

We will provide updates on developments in the Statement of Works process and Appendix G trials.

Constrained networks
We will agree actions with customers which best resolve their issues connecting to constrained networks for implementation in 2016/17 and 2017/18
Actions agreed to resolve constrained network issue
Necessary actions agreed with customers and improvement plan updated accordingly in Q4 of 2016/17
EHV
HV
M
DG
Complete
Constrained networks

Constrained networks

We said we would consult with our customers to better understand their experiences of connecting to constrained networks in our region.

Constrained networks

Constrained networks

We said we would consult with our customers to better understand their experiences of connecting to constrained networks in our region.

Continued engagement on A&D fees
We will continue to engage with stakeholders about the A&D fees we charge.
Stakeholders will be better informed about the A&D fees we charge, including how we apply those charges and the information that is available to them before making a quotation application.
Two engagement sessions held.
All
M
DG
Complete
Continued engagement on Assessment and Design fees

Continued engagement on Assessment and Design fees

We will continue to engage with our stakeholders about the Connection Offer Expenses (A&D fees) we charge.

Continued engagement on Assessment and Design fees

Continued engagement on Assessment and Design fees

We will continue to engage with our stakeholders about the Connection Offer Expenses (A&D fees) we charge.

Contract milestones
We will implement standard contract milestones for projects that fail to proceed
Northern Powergrid standard contract milestones
Project termination milestones implemented in all (100%) of Northern Powergrid contracts
EHV
HV
M
DG
Complete
Contract milestones for projects that fail to proceed

Contract milestones for projects that fail to proceed

We said we would implement standard contract milestones for projects that fail to proceed.

Contract milestones for projects that fail to proceed

Contract milestones for projects that fail to proceed

We said we would implement standard contract milestones for projects that fail to proceed.

Capacity clawback
We will proactively contact HV and EHV distributed generation customers utilising less than 75% of their maximum export capacity to discuss the release of unused capacity
Ability for DNOs to release unused network capacity
All (100%) of customers in the 75% range contacted
EHV
HV
M
DG
Complete
Customers utilising less than 75% of their maximum export capacity

Customers utilising less than 75% of their maximum export capacity

We said we would contact all our HV and EHV generation customers utilising less than 75% of their maximum export capacity to discuss the release of unused capacity.

Customers utilising less than 75% of their maximum export capacity

Customers utilising less than 75% of their maximum export capacity

We said we would contact all our HV and EHV generation customers utilising less than 75% of their maximum export capacity to discuss the release of unused capacity.

T/D interface
We will continue to support customers through the T/D interface and engage on their behalf in the activities of the national working parties. Where necessary, we will implement changes to our existing policies and working practices to reflect best practice recommendations.
Customers will be better informed and supported through the T/D interface.
Progress reported and new policy and processes implemented as necessary.
EHV
M
DG
Complete
Transmission/Distribution interface

Transmission/Distribution interface

We continued to support customers through the T/D interface and engaged on their behalf in the activities of the national working party tasked with looking at this. Where necessary, we made changes to our existing policies and practices to reflect best practice.

Transmission/Distribution interface

Transmission/Distribution interface

We continued to support customers through the T/D interface and engaged on their behalf in the activities of the national working party tasked with looking at this. Where necessary, we made changes to our existing policies and practices to reflect best practice.

The Transmission/Distribution interface and Statement of Works process
We will continue to work with the Open Networks Project to develop the Statement of Works process and, if required, make changes to our current practices to better support our customers.
Customers will be better informed about the T/D and Statement of Works process.
Progress reported and new policy/process implemented as necessary.
EHV
HV
U
DG
Complete
The Transmission/Distribution interface and Statement of Works Process

The Transmission/Distribution interface and Statement of Works Process

We continue to play an active role in the activities of the Open Networks Project group tasked with reforming the Statement of Works process.

The Transmission/Distribution interface and Statement of Works Process

The Transmission/Distribution interface and Statement of Works Process

We continue to play an active role in the activities of the Open Networks Project group tasked with reforming the Statement of Works process.

Flexible connections
We published information on flexible connections for stakeholders considering this type of arrangement, including any changes necessitated by the Access and Forward-looking Charges Significant Code Review.
Stakeholders will be better informed and know what to expect when accepting this type of offer. They will know who to contact to discuss a flexible connection and how to make changes to an existing arrangement.
Guidance published. FAQs updated.
EHV
HV
DG
Complete
Flexible connections

Flexible connections

We published information on flexible connections for stakeholders considering this type of arrangement, including any changes necessitated by the Access and Forward-looking Charges Significant Code Review.

Flexible connections

Flexible connections

We published information on flexible connections for stakeholders considering this type of arrangement, including any changes necessitated by the Access and Forward-looking Charges Significant Code Review.

Flexible connections

Flexible connections

We published information on flexible connections for stakeholders considering this type of arrangement, including any changes necessitated by the Access and Forward-looking Charges Significant Code Review.

Flexible connections

Flexible connections

We published information on flexible connections for stakeholders considering this type of arrangement, including any changes necessitated by the Access and Forward-looking Charges Significant Code Review.

Technical and commercial developments
We will develop an online knowledge base for installers and electrical contractors with practical guidance and technical information.
Stakeholders will be better informed and have a useful reference library of technical information, resources and guidance.
Engage with stakeholders to understand their requirements. Technical information and resources developed and published.
HV
LV
M
U
DG
ICP
Complete
Technical guidance for contractors and installers

Technical guidance for contractors and installers

We will develop an online knowledge base for installers and electrical contractors, with practical guidance and technical information.

Technical guidance for contractors and installers

Technical guidance for contractors and installers

We will develop an online knowledge base for installers and electrical contractors, with practical guidance and technical information.

Technical guidance for contractors and installers

Technical guidance for contractors and installers

We will develop an online knowledge base for installers and electrical contractors, with practical guidance and technical information.

Technical guidance for contractors and installers

Technical guidance for contractors and installers

We will develop an online knowledge base for installers and electrical contractors, with practical guidance and technical information.

Contract milestones
We will continue to participate in the development of the ENA good practice guide on standard milestones for connection contracts
Standardised milestones in DNO quotation offers
Good practice guide completed
EHV
HV
M
DG
Complete
ENA good practice guide

ENA good practice guide

We said we would participate in the development of the ENA good practice guide on implementation of standard milestones for connection contracts.

ENA good practice guide

ENA good practice guide

We said we would participate in the development of the ENA good practice guide on implementation of standard milestones for connection contracts.

Export limiting schemes
We will develop and implement policy on the use of export limiting devices for Northern Powergrid connections and communicate the policy to customers
Ability to propose the use of export limiting devices for generation connections
Policy implementation and information shared
All
DG
Complete
Export limiting schemes

Export limiting schemes

We said we would review our policy on the use of export limiting schemes on our network.

Export limiting schemes

Export limiting schemes

We said we would review our policy on the use of export limiting schemes on our network.

Next steps to faciliate the roll-out of Electric Vehicles (EVs) in our region
We will engage with stakeholders to inform them about the steps being taken to facilitate the roll-out of EVs in our region.
Stakeholders will have a greater understanding of what we are doing to prepare for the expected growth in EVs and a platform to explore the challenges and opportunities ahead.
Two dedicated engagement sessions held in the 2019/20 ICE plan year.
LV
M
U
DG
ICP
Complete
Supporting the electrification of transport in our region.

Supporting the electrification of transport in our region.

We engaged with stakeholders to inform them about the steps that are being taken to facilitate the roll-out of Electric Vehicles in our region.

Supporting the electrification of transport in our region.

Supporting the electrification of transport in our region.

We engaged with stakeholders to inform them about the steps that are being taken to facilitate the roll-out of Electric Vehicles in our region.

Active network management (ANM)
We will run a focussed session for stakeholders on active network management
Better informed about our deployment plans for active network management
Information shared
All
DG
Complete
Sharing our strategy for ANM

Sharing our strategy for ANM

We said we would run a focused session for stakeholders on Active Network Management (ANM).

Sharing our smart grid strategy
We will run a focussed session for stakeholders on Northern Powergrid’s innovation strategy, incorporating storage, demand side response and active network management
Better understanding of our innovation strategy and smart grid development plan
Information shared
All
M
DG
Complete
Sharing our smart grid strategy

Sharing our smart grid strategy

We said we would run a focused briefing session for stakeholders on our innovation strategy.

Release of unused network capacity
We will participate in the Ofgem QMEC actions being carried out by the DG-DNO steering group on the withdrawal of network capacity from slow moving projects. We will communicate the outcomes and implement any necessary policy and process changes resulting from these actions
Better management of slow moving contracts to release unused capacity
Progress reported, new policy and processes implemented
All
M
U
DG
ICP
Complete
QMEC actions on release of unused capacity

QMEC actions on release of unused capacity

We said we would participate in the QMEC actions on withdrawal of network capacity from slow moving projects, communicate the outcomes and implement any necessary policy and process changes.

QMEC actions on release of unused capacity

QMEC actions on release of unused capacity

We said we would participate in the QMEC actions on withdrawal of network capacity from slow moving projects, communicate the outcomes and implement any necessary policy and process changes.

Protection policy
We will review our protection policy and confirm our position on third party witness testing.
A policy review on protection and witness testing
Policy review and position on witness testing confirmed
All
DG
Complete
Protection policy and witness testing

Protection policy and witness testing

We said we would review our protection policy and confirm our position on third party witness testing.

Protection policy and witness testing

Protection policy and witness testing

We said we would review our protection policy and confirm our position on third party witness testing.

Protection policy and small scale connections
We will review our protection policy, including the protection scheme requirements compared to the size and cost of the connection solution and advise customers our new policy
A revised policy on protection scheme requirements
Policy review and information shared
All
DG
Complete
Protection policy and small scale connections

Protection policy and small scale connections

We said we would review our protection policy, in particular, the protection scheme requirements compared to the size and cost of the connection solution,

Protection policy and small scale connections

Protection policy and small scale connections

We said we would review our protection policy, in particular, the protection scheme requirements compared to the size and cost of the connection solution,

New Electric Vehicle (EV) connections
We will engage with those stakeholders who are interested in new EV connections by delivering a minimum of two dedicated engagement sessions.
Stakeholders will be better informed about our approach to EV connections and our associated processes.
Two engagement sessions held.
LV
M
U
Complete
New EV connections

New EV connections

We will engage with stakeholders interested in new EV connections and hold a minimum of two engagement sessions.

New EV connections

New EV connections

We will engage with stakeholders interested in new EV connections and hold a minimum of two engagement sessions.

Network constraint and curtailment information
We will conduct a review on the provision of network constraint and curtailment information.
A better understanding and agreement of what the provision of constraint and curtailment information entails.
Review conducted.
HV
M
DG
Complete
Network constraint and curtailment information

Network constraint and curtailment information

We conducted a comprehensive consultation and review and then confirmed our approach to the provision of network constraint and curtailment information.

Network constraint and curtailment information

Network constraint and curtailment information

We conducted a comprehensive consultation and review and then confirmed our approach to the provision of network constraint and curtailment information.

Knocked down telecommunications street furniture
We will develop a more efficient process in respect of the connection of 'knocked down' telecommunication street furniture.
Faster reconnection of knocked down telecommunication street furniture.
New process developed.
LV
M
U
Complete
Knocked down telecommunications street furniture

Knocked down telecommunications street furniture

We will develop a new process whereby telecommunications street furniture that is damaged in road traffic accidents can be reconnected more quickly.

Knocked down telecommunications street furniture

Knocked down telecommunications street furniture

We will develop a new process whereby telecommunications street furniture that is damaged in road traffic accidents can be reconnected more quickly.

Technical and commercial developments
We will establish a Low Carbon Technology connections local working group.
Stakeholders will be better informed and have clarity on rules and processes for low carbon technology connections as they evolve.
Local working group established. Minimum of four engagement sessions held.
HV
LV
M
U
DG
ICP
Complete
Low Carbon Technology connections local working group.

Low Carbon Technology connections local working group.

We will establish a Low Carbon Technology connections local working group.

Low Carbon Technology connections local working group.

Low Carbon Technology connections local working group.

We will establish a Low Carbon Technology connections local working group.

Enabling competition
Enabling competition
We will make changes to our Competition in Connections webpage to improve the functionality and usability.
Stakeholders will find it easier to locate and access information, documents and services online.
Engage with stakeholders to understand their experience and requirements. Website changes implemented.
M
U
DG
ICP
Complete
Competition in Connections webpage.

Competition in Connections webpage.

We will make changes to our Competition in Connections webpage to improve the functionality and usability.

Competition in Connections webpage.

Competition in Connections webpage.

We will make changes to our Competition in Connections webpage to improve the functionality and usability.

Engagement with ICPs and IDNOs
We engaged with ICPs and IDNOs to develop and agree our future engagement strategy.
Stakeholders will have the opportunity to inform and shape our engagement strategy.
Engage with stakeholders to understand their expectations and requirements. Minimum of two dedicated engagement sessions held.
All
ICP
Complete
Engagement with ICPs and IDNOs

Engagement with ICPs and IDNOs

We engaged with ICPs and IDNOs to develop and agree our future engagement strategy.

Engagement with ICPs and IDNOs

Engagement with ICPs and IDNOs

We engaged with ICPs and IDNOs to develop and agree our future engagement strategy.

Updates to our alternative providers register
We will make changes to the alternative provider register on our website so that ICPs who are authorised to self-determine points of connection and self-approve designs are clearly identifiable.
It will be quicker and easier to identify ICPs who are authorised by Northern Powergrid and NERs to self-determine points of connection and self-approve designs.
Website changes implemented. Stakeholder briefings delivered.
All
U
ICP
Complete
Updates to our alternative provider register

Updates to our alternative provider register

We made changes to the alternative provider register on our website so that ICPs who are authorised to self-determine points of connection and self-approve designs are clearly identifiable to customers looking to appoint an ICP to carry out contestable works.

Updates to our alternative provider register

Updates to our alternative provider register

We made changes to the alternative provider register on our website so that ICPs who are authorised to self-determine points of connection and self-approve designs are clearly identifiable to customers looking to appoint an ICP to carry out contestable works.

Extending the scope of contestable works
We will develop a new process that will allow accredited ICPs to undertake street lighting overhead pole transfers as contestable works.
The new process will allow accredited ICPs to undertake this work, extending the scope of the works they can offer to unmetered clients.
New process developed and implemented.
LV
U
ICP
Complete
Extending the scope of contestable works.

Extending the scope of contestable works.

We developed a new process that allows accredited ICPs to undertake street lighting overhead pole transfers as contestable works.

Extending the scope of contestable works.

Extending the scope of contestable works.

We developed a new process that allows accredited ICPs to undertake street lighting overhead pole transfers as contestable works.

ICP design matrix
We will update our standard design matrix rules to include unmetered connections and simplify the technical specification.
The action will extend the scope and ease with which ICPs can self-determine point of connections.
Updated standard design matrix produced and published.
LV
ICP
Complete
ICP design matrix

ICP design matrix

We updated our standard design matrix rules to include unmetered connections and simplified the technical specification.

ICP design matrix

ICP design matrix

We updated our standard design matrix rules to include unmetered connections and simplified the technical specification.

ICP input services
ICPs will have a better understanding of the input services Northern Powergrid provide and how best to access them.
ICPs will have a better understanding of the input services Northern Powergrid provide and how best to access them.
End to end process map produced and published.
ICP
Complete
ICP input services

ICP input services

We developed an end-to-end process map that covers all aspects of our input services and explains how ICPs can interface with us more effectively.

ICP input services

ICP input services

We developed an end-to-end process map that covers all aspects of our input services and explains how ICPs can interface with us more effectively.

Metered disconnection trial
We will design and run an ICP metered disconnections pilot
Allow ICPs to carry out metered disconnections on brownfield sites
Pilot scheme completed and outcome reviewed
HV
LV
M
Complete
ICP metered disconnections as business as usual

ICP metered disconnections as business as usual

We said we would implement metered disconnections for ICPs.

ICP self-determination point of connection (POC)
We will hold a workshop and demonstration for ICPs on how to self-determine POCs
Better understanding for ICP customers about how to self-determine POCs
Workshop delivered to stakeholders
All
M
U
DG
ICP
Complete
ICP self-determination of point of connection

ICP self-determination of point of connection

We said we would hold a workshop for ICPs to demonstrate how to self-determine points of connection.

ICP self-determination of point of connection

ICP self-determination of point of connection

We said we would hold a workshop for ICPs to demonstrate how to self-determine points of connection.

IDNO connections
We will review our policy on the installation of link boxes for non-domestic, small works IDNO connections.
The requirement to install link boxes for non-domestic, small works connections like EV chargers on IDNO networks will be reconsidered and where practicable removed, making the process quicker, easier and more cost-effective.
Policy reviewed and revised as required. Stakeholder briefings delivered.
LV
ICP
Complete
IDNO connections

IDNO connections

We will review our policy on the installation of link boxes for non-domestic, small works Independent Distribution Network Operator connections.

IDNO connections

IDNO connections

We will review our policy on the installation of link boxes for non-domestic, small works Independent Distribution Network Operator connections.

Self-service adoption agreements for ICPs
We will develop, trial and, if the trial is successful, implement a new self-service adoption agreement process for ICPs.
ICPs will be able to create their own asset adoption agreements using simple agreed templates and submit them to Northern Powergrid for legal completion, further minimising the connection input services we are required to provide.
New ICP self-service adoption agreements implemented.
All
ICP
Complete
Self-service adoption agreements for ICPs

Self-service adoption agreements for ICPs

We developed, trialled and implemented a new self-service adoption agreement process for ICPs.

Self-service adoption agreements for ICPs

Self-service adoption agreements for ICPs

We developed, trialled and implemented a new self-service adoption agreement process for ICPs.

Schedule of rates for input services
We will publish a schedule of rates for the input services available to ICPs so that they can ‘pick and mix’ the services they require.
ICPs will have a better understanding of the costs of input services Northern Powergrid provide.
Schedule of rates produced and published.
All
ICP
Complete
Schedule of rates for input services

Schedule of rates for input services

We developed a schedule of rates for the input services available to ICPs so that they could ‘pick and mix’ the services they require.

Schedule of rates for input services

Schedule of rates for input services

We developed a schedule of rates for the input services available to ICPs so that they could ‘pick and mix’ the services they require.

Part-funded reinforcement
We will run a part-funded reinforcement trial, communicate the progress and outcome to customers and post-trial consider how we can make this a business-as-usual activity
Enable ICPs to participate in part-funded reinforcement trials
Information shared and next steps considered
EHV
HV
M
DG
ICP
Complete
Part-funded reinforcement trial

Part-funded reinforcement trial

We said we would run a part-funded reinforcement trial, communicate the outcomes and consider how we can make this a business-as-usual activity.

Part-funded reinforcement trial

Part-funded reinforcement trial

We said we would run a part-funded reinforcement trial, communicate the outcomes and consider how we can make this a business-as-usual activity.

Metered disconnections as business-as-usual
We will implement metered disconnections for ICPs
Allow ICPs to carry out metered disconnections on brownfield sites
Process and policy developed and information shared
HV
LV
M
ICP
Complete
Metered disconnections pilot

Metered disconnections pilot

We said we would We will design and run a metered disconnections pilot for ICPs.

Metered disconnections pilot

Metered disconnections pilot

We said we would We will design and run a metered disconnections pilot for ICPs.

Legal agreements for ICPs
We will implement a new process to enable IDNOs to accept an agreement by signing it electronically.
The process will become quicker and more streamlined for Independent Connections Distributors (IDNOs).
New process implemented.
All
ICP
Complete
Legal agreements for ICPs

Legal agreements for ICPs

We will implement a new process to enable IDNOs to accept an agreement by signing it electronically.

Legal agreements for ICPs

Legal agreements for ICPs

We will implement a new process to enable IDNOs to accept an agreement by signing it electronically.

Independent inspections
We will secure long term independent inspection services to inspect SLC15 and Section 16 connections delivery operations.
All installed connections assets will be inspected in the same manner by an independent organisation.
Percentage of independent quality assurance inspections carried out on Northern Powergrid and ICPs and non-conformance rate from inspections.
All
ICP
Complete
Independent inspections

Independent inspections

We said we would secure long term independent inspection services to inspect SLC15 and Section 16 connections delivery operations.

Independent inspections

Independent inspections

We said we would secure long term independent inspection services to inspect SLC15 and Section 16 connections delivery operations.

ICP design approvals
We will publish the average time it takes us to issue ICP point of connection and design approvals on our website
Customers will have visibility on the time it takes Northern Powergrid to issue point of connection and design approvals to ICPs
Data published every quarter.
All
M
U
DG
ICP
Complete
Issuing ICP design approvals

Issuing ICP design approvals

Following feedback from ICPs we now publish the average time it takes us to issue point of connection and design approvals on our website every month.

Issuing ICP design approvals

Issuing ICP design approvals

Following feedback from ICPs we now publish the average time it takes us to issue point of connection and design approvals on our website every month.

Innovation
Innovation
We will engage with stakeholders to help them to understand about how connections processes and customers could be affected by our developing new role as a DSO.
Stakeholders will be better informed and have a platform to discuss our DSO transition and topics including flexibility services.
Minimum of two engagement sessions held in the ICE plan year.
All
M
U
DG
ICP
Complete
DSO transition

DSO transition

We will engage with stakeholders to help them to understand about how connections processes and customers could be affected by our developing new role as a Distribution System Operator (DSO).

DSO transition

DSO transition

We will engage with stakeholders to help them to understand about how connections processes and customers could be affected by our developing new role as a Distribution System Operator (DSO).

Active Network Management (ANM)
We will engage with customers on the progress of our first replicable ANM scheme in Driffield.
Customers will understand how the Driffield ANM scheme works, the network communications, charging policy and how it can be applied to other areas of the Northern Powergrid network.
Progress communicated.
All
DG
Complete
Active Network Management (ANM)

Active Network Management (ANM)

We engaged with our customers about the progress of our first replicable ANM scheme in Driffield.

Active Network Management (ANM)

Active Network Management (ANM)

We engaged with our customers about the progress of our first replicable ANM scheme in Driffield.

Engaging with connections stakeholders as we transition to a DSO
We will continue to engage with stakeholders as we transition to a DSO.
Stakeholders will be involved and their views taken into consideration as we transition to a DSO.
Minimum of two engagement sessions held in the 2020/21 ICE plan year. Stakeholders will have opportunities to inform and help shape our strategy and approach.
EHV
HV
M
U
DG
ICP
Complete
Engaging with connections stakeholders on our DSO transition

Engaging with connections stakeholders on our DSO transition

We will continue to engage with stakeholders as we transition to a Distribution System Operator (DSO).

Engaging with connections stakeholders on our DSO transition

Engaging with connections stakeholders on our DSO transition

We will continue to engage with stakeholders as we transition to a Distribution System Operator (DSO).

Engaging with stakeholders to inform our Distribution Future Energy Scenarios.
We will continue to engage with stakeholders to inform our Distribution Future Energy Scenarios.
Stakeholders will be involved and have opportunities to contribute to our DFES and as a result will be able to help inform and shape our future investment plans
Data sought from stakeholders to inform our plans and projections. Minimum of two engagement sessions held in the 2020/21 ICE plan year.
EHV
HV
M
U
DG
ICP
Complete
Engaging with stakeholders to inform our Distribution Future Energy Scenarios.

Engaging with stakeholders to inform our Distribution Future Energy Scenarios.

We will continue to engage with stakeholders to inform our Distribution Future Energy Scenarios.

Engaging with stakeholders to inform our Distribution Future Energy Scenarios.

Engaging with stakeholders to inform our Distribution Future Energy Scenarios.

We will continue to engage with stakeholders to inform our Distribution Future Energy Scenarios.

Connecting Low-Carbon Technologies (LCTs).
We will develop and launch a new Low-Carbon Connection Gateway on our website.
Customers will have access to a new resource that provides information on different types of LCTs, how to apply for a connection and when to notify Northern Powergrid about their installation.
New Low-Carbon Connection Gateway available on our website.
All
DG
Complete
Connecting Low-Carbon Technologies

Connecting Low-Carbon Technologies

We said we would develop and launch a new resource that would help customers wanting to connect low-carbon technologies.

Connecting Low-Carbon Technologies

Connecting Low-Carbon Technologies

We said we would develop and launch a new resource that would help customers wanting to connect low-carbon technologies.

TSO/DSO roles
We will continue to support and contribute to the national working party on the development of TSO/ DSO roles and keep customers informed of the outcomes.
Customers will be better informed about the development of TSOs and DSOs.
Communicate the outcomes of the national working party on TSO/DSO to our customers.
All
M
DG
Complete
TSO/DSO roles

TSO/DSO roles

We said we would continue to support and contribute to the national working party on the development of TSO/ DSO roles and keep customers informed of the outcomes.

TSO/DSO roles

TSO/DSO roles

We said we would continue to support and contribute to the national working party on the development of TSO/ DSO roles and keep customers informed of the outcomes.

Distribution Network Operator (DNO) to Distribution System Operator (DSO)
We will share our vision for the transition of DNOs to DSOs. We will describe the work taking place at Northern Powergrid and seek our customers’ views on how to shape the outputs of this work.
Customers will be kept informed about Northern Powergrid’s transition and will have the opportunity to engage and shape future outputs.
Vision and strategy shared with interested stakeholders
All
M
U
DG
ICP
Complete
Distribution Network Operator (DNO) to Distribution System Operator (DSO)

Distribution Network Operator (DNO) to Distribution System Operator (DSO)

We said we would share our vision for the transition of DNOs to DSOs. We will describe the work taking place at Northern Powergrid and seek our customers’ views on how to shape the outputs of this work.

Distribution Network Operator (DNO) to Distribution System Operator (DSO)

Distribution Network Operator (DNO) to Distribution System Operator (DSO)

We said we would share our vision for the transition of DNOs to DSOs. We will describe the work taking place at Northern Powergrid and seek our customers’ views on how to shape the outputs of this work.

Better technical guidance for generators.
We will publish technical guidance for generators on how to go about making a connection application for hybrid generation-storage sites.
Generators will have access to improved technical guidance and be better informed about how to make a connection applications for hybrid generation-storage sites.
Guidance published
EHV
HV
DG
Complete
Technical guidance for generators

Technical guidance for generators

We published a technical guidance note for generators on how to make a connection application for hybrid generation-storage sites.

Technical guidance for generators

Technical guidance for generators

We published a technical guidance note for generators on how to make a connection application for hybrid generation-storage sites.

Energy storage case studies
We will develop and publish case studies that share future use cases and applications for energy storage.
Customers will have access to a suite of energy storage case studies to help shape their future business plans and direction.
Two case studies produced and published on our website.
EHV
HV
DG
Complete
Energy storage case studies

Energy storage case studies

We said we would develop and publish case studies that share future use cases and applications for energy storage.

Energy storage case studies

Energy storage case studies

We said we would develop and publish case studies that share future use cases and applications for energy storage.

Our engagement with flexibility service providers
We will engage with flexibility service providers to understand any improvements to our connections process that are required to support the continued growth of distributed energy resources such as storage, flexible generation and demand side response.
Stakeholders will be able to engage with our experts and can influence and inform changes to our connection process.
Stakeholder engagement session delivered.
EHV
M
DG
Complete
Engagement  with flexibility service providers

Engagement with flexibility service providers

We will engage with flexibility service providers to understand any improvements to our connections process required to support the continued growth of distributed energy resources.

Engagement  with flexibility service providers

Engagement with flexibility service providers

We will engage with flexibility service providers to understand any improvements to our connections process required to support the continued growth of distributed energy resources.

Standard suite of storage service offers.
We will engage with storage developers to create a suite of standard storage service offers.
The application process will become easier and more understandable.
Suite of storage offers developed and available for use.
EHV
HV
DG
Complete
Standard suite of storage service offers.

Standard suite of storage service offers.

We modified our application forms to make it quicker and easier for customers to make a storage connection application.

Standard suite of storage service offers.

Standard suite of storage service offers.

We modified our application forms to make it quicker and easier for customers to make a storage connection application.

Our transition to a distribution system operator (DSO)
We will continue to engage with stakeholders on our vision and strategy for our transition to a DSO.
Stakeholders will be better informed and have the opportunity to engage, share their views and shape future outputs.
Vision and strategy shared.
All
M
DG
Complete
Our transition to a Distribution System Operator (DSO)

Our transition to a Distribution System Operator (DSO)

We will continue to share our vision for our transition to a DSO with stakeholders and give them plenty of opportunities to help shape our strategy and approach.

Our transition to a Distribution System Operator (DSO)

Our transition to a Distribution System Operator (DSO)

We will continue to share our vision for our transition to a DSO with stakeholders and give them plenty of opportunities to help shape our strategy and approach.

Network development and investment
We engaged with stakeholders to communicate our network investment and development plans, including how our 'flexibility first' approach will help more stakeholders connect to our network.
Stakeholders will be better informed and have confidence in our network's capacity to support their net zero plans.
Engagement session held and plans communicated.
All
M
U
DG
ICP
Complete
Network development and investment

Network development and investment

We engaged with stakeholders to communicate our network investment and development plans, including how our 'flexibility first' approach will help more stakeholders connect to our network.

Network development and investment

Network development and investment

We engaged with stakeholders to communicate our network investment and development plans, including how our 'flexibility first' approach will help more stakeholders connect to our network.

Our transition to a Distribution Systems Operator (DSO)
We will continue to engage with stakeholders as we transition to a DSO.
Stakeholders will be involved as we transition to a DSO. They will be able to inform our strategy and approach and be kept informed about opportunities arising, including the provision of flexibility services.
Two dedicated engagement sessions held in the 2019/20 ICE plan year. Stakeholders will have opportunities to provide feedback and help shape our DSO transition plans.
All
M
U
DG
ICP
Complete
Our DSO transition

Our DSO transition

We continued to engage with stakeholders as we transition to a Distribution Systems Operator (DSO).

Our DSO transition

Our DSO transition

We continued to engage with stakeholders as we transition to a Distribution Systems Operator (DSO).

Incentive on Connections Engagement (ICE)

Service improvement work plans

View timeline
FILTER
Complete
M
U
DG
ICP

Connections 101 sessions

End date: March 2023

We hosted 'connections 101' sessions to introduce stakeholders to our connections bu ...
More...
Complete
ICP

Engagement with ICPs and IDNOs

End date: March 2023

We engaged with ICPs and IDNOs to develop and agree our future engagement strategy.
More...
Complete
M
U
DG
ICP

Engaging with connections stakeholders

End date: March 2023

We worked with stakeholders to develop and agree our connections engagement strategy ...
More...
Complete
M
U
DG
ICP

Pre-application support

End date: March 2023

We engaged with stakeholders and used their feedback to inform our pre-application s ...
More...
Complete
M
U
DG
ICP

Network development and investment

End date: March 2023

We engaged with stakeholders to communicate our network investment and development p ...
More...
Complete
M
U
DG
ICP

Network data sources

End date: March 2023

We published information on different network data sources and platforms we make ava ...
More...
Complete
M
U
DG
ICP

Network data requests

End date: March 2023

We formalised the process whereby stakeholders can request network data and informat ...
More...
Complete
M
DG

Network constraints

End date: March 2023

We will ensure stakeholders with proposed or existing connections affected by known ...
More...
Complete
M
DG

Known network constraints

End date: March 2023

We published details of any known constraints on the transmission and distribution n ...
More...
Complete
M
U
ICP

EV connections guidance

End date: December 2022

We updated our guidance for stakeholders seeking EV connections.
More...
Complete
DG

Flexible connections

End date: December 2022

We published information on flexible connections for stakeholders considering this t ...
More...
Complete
M
U
DG
ICP

Innovation

End date: March 2022

We will engage with stakeholders to help them to understand about how connections pr ...
More...
Complete
M
U
DG
ICP

Enabling competition

End date: March 2022

We will make changes to our Competition in Connections webpage to improve the functi ...
More...
Complete
M
DG
ICP

Provision of information

End date: March 2022

We will provide training and tutorials on how to use our network availability heat m ...
More...
Complete
M
U
DG
ICP

Provision of information

End date: March 2022

We will develop an end-to-end connections process guide for major works customers.
More...
Complete
M
U
DG
ICP

Provision of information

End date: March 2022

We will make changes to our Get Connected homepage to improve the functionality and ...
More...
Complete
M
U
DG

Improving our communication and engagement

End date: March 2022

We will host regular engagement sessions with Local Authorities to support their pip ...
More...
Complete
M
U
DG
ICP

Technical and commercial developments

End date: March 2022

We will establish a Low Carbon Technology connections local working group.
More...
Complete
U

Provision of information

End date: March 2022

We will update our unmetered connections guide.
More...
Complete
M
U
DG
ICP

Technical and commercial developments

End date: March 2022

We will develop an online knowledge base for installers and electrical contractors w ...
More...
Complete
M
U
DG
ICP

Provision of information

End date: February 2022

We will update our connections contact guide to include regional contacts and signpo ...
More...
Complete
M
U
DG
ICP

Technical and commercial developments

End date: December 2021

We will engage with stakeholders on our Connection Offer Expenses (COE).
More...
Complete
M
DG
ICP

Improving our application and delivery processes

End date: October 2021

We will provide information on different types of connections including G98/99 and f ...
More...
Complete
DG

Accelerated Loss of Mains Change Programme

End date: March 2021

We will establish a local working group for stakeholders involved in the ENA’s Acc ...
More...
Complete
DG

Providing timely and accurate information for generators on planned outages

End date: March 2021

We will develop and run a trial with generators to provide more timely and accurate ...
More...
Complete
M
U
DG
ICP

Stakeholders will be better informed and find it quicker and easier to make applications for different types of LCTs.

End date: March 2021

We will make changes to our online application process to make it easier to apply to ...
More...
Complete
M
U
DG
ICP

Developing our budget estimating tool

End date: March 2021

We will engage with stakeholders and seek feedback to develop our budget estimating ...
More...
Complete
M
U
DG
ICP

Engaging with connections stakeholders as we transition to a DSO

End date: March 2021

We will continue to engage with stakeholders as we transition to a DSO.
More...
Complete
M
U
DG
ICP

We will engage with stakeholders on the electrification of heating and our role in the low carbon transition

End date: March 2021

We will engage with stakeholders on the electrification of heating and our role in t ...
More...
Complete
M
U
DG
ICP

We will continue to engage with stakeholders about the actions we are taking to support the roll-out of Electric Vehicles (EVs) in our region and on our role in the low carbon transition

End date: March 2021

We will continue to engage with stakeholders about the actions we are taking to supp ...
More...
Complete
DG

Support for Community Energy groups and stakeholders

End date: March 2021

We will provide support for Community Energy groups and stakeholders seeking a new c ...
More...
Complete
M
U
DG
ICP

Local energy planning forums

End date: March 2021

We will host local energy planning forums for local government and other interested ...
More...
Complete
M
U
ICP

Streamlining our application process

End date: March 2021

We will work with customers who make multiple, repeat applications to streamline our ...
More...
Complete
M
U
DG
ICP

Pre-application surgeries for planners and developers

End date: March 2021

We will offer free pre-application surgeries for developers, Local Authority planner ...
More...
Complete
M
U
DG

Engaging with installers of Low Carbon Technologies (LCTs)

End date: February 2021

We will engage with installers of LCTs to understand their priorities, challenges an ...
More...
Complete
ICP

IDNO engagement

End date: January 2021

We will host a connections forum for Independent Distribution Network Operators (IDN ...
More...
Complete
M
U
DG
ICP

Engaging with stakeholders to inform our Distribution Future Energy Scenarios.

End date: December 2020

We will continue to engage with stakeholders to inform our Distribution Future Energ ...
More...
Complete
M
DG

Heat map data

End date: November 2020

We will publish data on transmission constraints and mod apps on our heat maps
More...
Complete
U
ICP

Updates to our alternative providers register

End date: November 2020

We will make changes to the alternative provider register on our website so that ICP ...
More...
Complete
ICP

IDNO connections

End date: November 2020

We will review our policy on the installation of link boxes for non-domestic, small ...
More...
Complete
M
U

Guide for Local Authorities and LEPs

End date: September 2020

We will produce a guide aimed at Local Authorities and LEPs which signposts the supp ...
More...
Complete
M

Engaging with customers with poor power factor

End date: March 2020

We will engage customers with poor power factor and offer advice on how they can red ...
More...
Complete
M
U
DG
ICP

Local government forums

End date: March 2020

We will deliver a series of connections forums aimed at Local Authorities where they ...
More...
Complete
M
U
DG
ICP

Our transition to a Distribution Systems Operator (DSO)

End date: March 2020

We will continue to engage with stakeholders as we transition to a DSO.
More...
Complete
M
U
DG
ICP

Next steps to faciliate the roll-out of Electric Vehicles (EVs) in our region

End date: February 2020

We will engage with stakeholders to inform them about the steps being taken to facil ...
More...
Complete
M
U
DG
ICP

Connections surgeries

End date: February 2020

We will engage with stakeholders to understand what we could do to improve their con ...
More...
Complete
M
U
DG
ICP

LV budget estimating tool

End date: January 2020

We will develop and deploy a new LV self-serve budget estimating tool.
More...
Complete
M
U
DG
ICP

Connections contact guide

End date: December 2019

We will produce a new guide for customers with contact details for our connections t ...
More...
Complete
M
U
ICP

New Electric Vehicle (EV) connections guide

End date: December 2019

We will develop and publish a new EV connections guide. We will also review the EV i ...
More...
Complete
M
DG

Training for heat map users

End date: December 2019

We will deliver training on our network availability heat maps for users.
More...
Complete
M
DG

Updates on Statement of Works process and Appendix G

End date: November 2019

We will provide updates on developments in the Statement of Works process and progre ...
More...
Complete
U
ICP

Extending the scope of contestable works

End date: November 2019

We will develop a new process that will allow accredited ICPs to undertake street li ...
More...
Complete
M
U
DG

Customers who connect through a third party

End date: October 2019

We will engage with stakeholders who use a contractor to procure multiple connection ...
More...
Complete
M
U
DG
ICP

SafeDig

End date: September 2019

We will inform stakeholders about the launch of our new SafeDig webpage and provide ...
More...
Complete
DG

Active Network Management (ANM) and future solutions

End date: March 2019

We will continue to engage with stakeholders about our ANM strategy including how, w ...
More...
Complete
M
DG

Our transition to a distribution system operator (DSO)

End date: March 2019

We will continue to engage with stakeholders on our vision and strategy for our tran ...
More...
Complete
M
DG

Network constraint and curtailment information

End date: March 2019

We will conduct a review on the provision of network constraint and curtailment info ...
More...
Complete
M
U

Knocked down telecommunications street furniture

End date: March 2019

We will develop a more efficient process in respect of the connection of 'knocked do ...
More...
Complete
DG

DG owner operator forum

End date: March 2019

We will hold a DG owner operator forum each quarter.
More...
Complete
U
DG

The Transmission/Distribution interface and Statement of Works process

End date: March 2019

We will continue to work with the Open Networks Project to develop the Statement of ...
More...
Complete
M
DG

Self-service budget tool

End date: March 2019

We will mobilise a project to build a self-service budget tool and keep our customer ...
More...
Complete
DG

Better technical guidance for generators.

End date: March 2019

We will publish technical guidance for generators on how to go about making a connec ...
More...
Complete
M
U
DG
ICP

Connection offer expiry dates

End date: February 2019

We will include the actual date on which the offer expires in each quotation we issu ...
More...
Complete
M
DG

Continued engagement on A&D fees

End date: February 2019

We will continue to engage with stakeholders about the A&D fees we charge.
More...
Complete
M
U
DG

Improved customer communications

End date: February 2019

We will include a description of the connection project as well as the enquiry refer ...
More...
Complete
M
DG
ICP

Applying for a temporary site supply

End date: January 2019

We will implement changes to our application process that make it easier for custom ...
More...
Complete
M
DG

Hard to reach connections stakeholders

End date: December 2018

We will hold dedicated engagements for hard to reach stakeholders with specific conn ...
More...
Complete
ICP

Legal agreements for ICPs

End date: November 2018

We will implement a new process to enable IDNOs to accept an agreement by signing it ...
More...
Complete
M
DG

Our engagement with flexibility service providers

End date: November 2018

We will engage with flexibility service providers to understand any improvements to ...
More...
Complete
M
U

New Electric Vehicle (EV) connections

End date: November 2018

We will engage with those stakeholders who are interested in new EV connections by d ...
More...
Complete
M
DG

Access to network information

End date: September 2018

We will develop a new process to provide customers who request it with access to mor ...
More...
Complete
M
DG
ICP

Network information

End date: September 2018

We will develop a new process to provide customers who request it with access to net ...
More...
Complete
M
U
DG
ICP

Contact information for connection engineers

End date: September 2018

We will create a new web page where customers can find the contact details for our r ...
More...
Complete
DG

DG connections guide

End date: September 2018

We will work with the ENA to update the DG connections guide and incorporate new tec ...
More...
Complete
ICP

Self-service adoption agreements for ICPs

End date: August 2018

We will develop, trial and, if the trial is successful, implement a new self-servic ...
More...
Complete
M
DG

Updates on our connections offers

End date: July 2018

We will provide customers with an update on the progress of their connection quotati ...
More...
Complete
M
U
DG
ICP

More targeted communications

End date: June 2018

We will create a new web based process to enable customers to register as an interes ...
More...
Complete
M
DG

Assessment and Design (A&D) fees

End date: March 2018

We will continue to contribute to the national debate on A&D fees and keep our custo ...
More...
Complete
M
DG

TSO/DSO roles

End date: March 2018

We will continue to support and contribute to the national working party on the deve ...
More...
Complete
M
DG

T/D interface

End date: March 2018

We will continue to support customers through the T/D interface and engage on their ...
More...
Complete
M
DG

Timescales for protection settings

End date: March 2018

We will conduct a formal business process review on the provision of protection sett ...
More...
Complete
DG

Standard suite of storage service offers.

End date: March 2018

We will engage with storage developers to create a suite of standard storage service ...
More...
Complete
M
U
DG
ICP

Social media

End date: March 2018

We will trial social media ‘Ask the Expert’ Q&A sessions on topics identfed by o ...
More...
Complete
M
U
DG
ICP

Undergrounding of networks in areas of outstanding natural beauty (AONB)

End date: March 2018

We will engage in a discussion with Ofgem on behalf of our stakeholders on the treat ...
More...
Complete
M
U

Find my MPAN online service

End date: March 2018

We will benchmark our fnd my MPAN online service against other DNOs and make improve ...
More...
Complete
DG

Energy storage case studies

End date: March 2018

We will develop and publish case studies that share future use cases and application ...
More...
Complete
DG

Active Network Management (ANM)

End date: March 2018

We will engage with customers on the progress of our first replicable ANM scheme in ...
More...
Complete
M
U
DG
ICP

Connections workshops

End date: March 2018

We will hold targeted workshops on emerging connections topics suggested by our cust ...
More...
Complete
M
DG

EHV quotations

End date: January 2018

We will add a front page summary to EHV quotations.
More...
Complete
DG

Connecting Low-Carbon Technologies (LCTs).

End date: December 2017

We will develop and launch a new Low-Carbon Connection Gateway on our website.
More...
Complete
DG

Storage applications

End date: December 2017

We will modify the G59 application form on our website to include an option to conne ...
More...
Complete
DG

Distributed generation connectons

End date: December 2017

We will create a quick cost calculator for generation connection applications and ma ...
More...
Complete
M
U
DG
ICP

Digital communications

End date: September 2017

We will trial recording the content of our connections forums and workshops and post ...
More...
Complete
M
U
DG
ICP

Distribution Network Operator (DNO) to Distribution System Operator (DSO)

End date: September 2017

We will share our vision for the transition of DNOs to DSOs. We will describe the wo ...
More...
Complete
ICP

ICP design matrix

End date: September 2017

We will update our standard design matrix rules to include unmetered connections and ...
More...
Complete
ICP

Independent inspections

End date: September 2017

We will secure long term independent inspection services to inspect SLC15 and Sectio ...
More...
Complete
M
U
DG

Access to mains records

End date: August 2017

We will hold a workshop for connections customers on how to access Northern Powergri ...
More...
Complete
M
U
DG
ICP

Implementaton of contract milestones

End date: August 2017

We will produce a simple guide to the implementation of new contract milestones.
More...
Complete
DG

Contracted capacity register

End date: July 2017

We will create a new contracted capacity register webpage that features an archive o ...
More...
Complete
M
DG

Multi-optioneering application service

End date: July 2017

We will create a new page on our website that promotes our multi-optioneering servic ...
More...
Complete
ICP

Schedule of rates for input services

End date: July 2017

We will publish a schedule of rates for the input services available to ICPs so that ...
More...
Complete
M
U
DG
ICP

ICP design approvals

End date: June 2017

We will publish the average time it takes us to issue ICP point of connection and de ...
More...
Complete
ICP

ICP input services

End date: June 2017

ICPs will have a better understanding of the input services Northern Powergrid provi ...
More...
Complete
M
DG

Assessment and design (A&D) fees

End date: March 2017

We will continue to support and actively engage in the national consultation on A&D ...
More...
Complete
M
DG

Contract milestones

End date: March 2017

We will implement standard contract milestones to clawback unused capacity after a m ...
More...
Complete
M
DG

Connecting new and innovative technologies

End date: March 2017

We will run a technical workshop for stakeholders exploring all aspects of connectin ...
More...
Complete
M
DG

Constrained networks

End date: March 2017

We will agree actions with customers which best resolve their issues connecting to c ...
More...
Complete
M
DG

Contract milestones

End date: March 2017

We will implement standard contract milestones for projects that fail to proceed
More...
Complete
M
DG

Contracted capacity register

End date: March 2017

We will refresh the data on our contracted capacity register on a monthly basis
More...
Complete
M
DG

Capacity clawback

End date: March 2017

We will proactively contact HV and EHV distributed generation customers utilising le ...
More...
Complete
M
U
DG
ICP

ICP design approvals

End date: March 2017

We will review of our ICP design approval process and make any necessary changes to ...
More...
Complete
M
DG

Transmission/Distribution (T/D) interface

End date: March 2017

We will support the national working party on transmission processes and adopt best ...
More...
Complete
M
DG
ICP

ICP quotations

End date: March 2017

We will implement a new process whereby ICPs will benefit from faster quotes for sit ...
More...
Complete
M
U
DG
ICP

ICP self-determination point of connection (POC)

End date: March 2017

We will hold a workshop and demonstration for ICPs on how to self-determine POCs
More...
Complete
M
DG

Provision of information on wayleaves

End date: March 2017

We will publish quarterly wayleaves and easements performance statistics
More...
Complete
M
DG
ICP

Part-funded reinforcement

End date: March 2017

We will run a part-funded reinforcement trial, communicate the progress and outcome ...
More...
Complete
M
DG

Heat maps

End date: March 2017

Refresh the data on our generation and demand heat maps on a monthly basis
More...
Complete
M
U
DG

Converting budget estimates into firm quotations

End date: December 2016

We will improve how we issue budget estimates to make it quicker and easier for cust ...
More...
Complete
M
DG

Connections case studies

End date: December 2016

We will produce case studies on different HV and EHV connections projects to help cu ...
More...
Complete
M
DG
ICP

ICP design approvals

End date: December 2016

We will publish approved standard templates for 11kV, 20kV and 33kV connections for ...
More...
Complete
M
U
DG

Single points of contact

End date: December 2016

We will provide single points of contact in quotation and delivery for all connectio ...
More...
Complete
M
U
DG
ICP

Release of unused network capacity

End date: December 2016

We will participate in the Ofgem QMEC actions being carried out by the DG-DNO steeri ...
More...
Complete
U

Re-connection of knocked down street lighting

End date: December 2016

We will run a pilot with a Local Authority to reconnect knocked down streetlighting ...
More...
Complete
DG

Protection policy and small scale connections

End date: December 2016

We will review our protection policy, including the protection scheme requirements c ...
More...
Complete
M
ICP

Metered disconnections as business-as-usual

End date: December 2016

We will implement metered disconnections for ICPs
More...
Complete
M
DG

Contract milestones

End date: November 2016

We will continue to participate in the development of the ENA good practice guide on ...
More...
Complete
DG

Protection policy

End date: November 2016

We will review our protection policy and confirm our position on third party witness ...
More...
Complete
M
U
DG
ICP

Stakeholder updates

End date: October 2016

We will ensure customers are kept informed of the progress of our ICE work plan acti ...
More...
Complete
M
U
DG
ICP

Understanding technical terminology

End date: September 2016

We will develop a jargon buster to help customers understand the technical terminolo ...
More...
Complete
M

Metered disconnection trial

End date: September 2016

We will design and run an ICP metered disconnections pilot
More...
Complete
DG

Export limiting schemes

End date: July 2016

We will develop and implement policy on the use of export limiting devices for North ...
More...
Complete
DG

Active network management (ANM)

End date: May 2016

We will run a focussed session for stakeholders on active network management
More...
Complete
M
DG

Sharing our smart grid strategy

End date: May 2016

We will run a focussed session for stakeholders on Northern Powergrid’s innovation ...
More...

CONNECTIONS ENQUIRIES

0800 011 3433

[email protected]

MON - FRI:

8am - 8pm

SAT:

9am - 5pm

Have you checked out our Help & Advice directory, it may just have the answers that you're looking for.

Make an enquiry
BACK TO TOP
footer-logo
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2025

Cookie settings