Skip to main content
  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexibility Services
    • Green Recovery
    • Transmission Interface
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Innovation
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Partnership Working
    • Northern Powergrid Foundation
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Health and Safety
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Independent Stakeholder Group
    • DSO Review Panel
    • Digitalisation and Action Plan
    • Blogs
  • News
  • Careers

Login

Login to online services

We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

Login Menu
  • Connections
  • Cut Outs
  • Independent Point of Connection
  • Earth Requests
  • Disconnections
  • Moving our Equipment
  • Enquiries
  • Safety Advice
  • SafeDig
  • Shrouding
  • Service Alterations
Northern Powergrid Homepage
  • My power is off
  • New connections
  • Existing connections
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Independent Stakeholder Group
    • Distribution System Operation
    • DSO Review Panel
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Partnership Working
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Northern Powergrid Foundation
    • Open Data Portal
    • New Power Generation
    • Safety
    • Services Directory
    • Smart Metering
    • Transmission interface
    • Weather Aware
  • Power cuts
  • New Connections

    New Connections

    Information

    • Battery Storage
    • EV Charging Points
    • Energy Storage Systems
    • Generation
    • Heat Pumps
    • Independent Point of Connection
    • New Connection
    • Solar Panels
    • Street Furniture (metered)
    • Street Furniture (unmetered)
    • Temporary Connection
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions
  • Existing connections

    Existing Connections

    Information

    • Battery Storage
    • Change Capacity
    • Disconnections
    • Energy Storage Systems
    • EV Charging Points
    • Generation
    • Heat Pumps
    • Move Equipment
    • Solar Panels
    • Street Furniture Changes
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions

    If you are an organisation that installs low carbon technology in residential premises that have an existing connection, you can use ENA Connect Direct. It’s a new, faster way to get approval to connect residential low-carbon technology to the grid.

  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    Login to online services

    We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

    Login Menu
    • Connections
    • Cut Outs
    • Independent Point of Connection
    • Earth Requests
    • Disconnections
    • Moving our Equipment
    • Enquiries
    • Safety Advice
    • SafeDig
    • Shrouding
    • Service Alterations
  • Search
Metered disconnections pilot
31/12/2016
01/04/2016
31/12/2016
Objectives completed

As of 31st December we completed work on this activity and achieved the following outcomes.

01/04/2016

Metered disconnections pilot

Action
We will implement metered disconnections for ICPs
The Outcome
Allow ICPs to carry out metered disconnections on brownfield sites
Target Measure
Process and policy developed and information shared
Voltage
LV
HV
RAG Status
Complete
Market Segments
M
ICP

We said we would We will design and run a metered disconnections pilot for ICPs.

“We welcomed the opportunity to work with Northern Powergrid on the metered disconnecton pilot through which we successfully delivered a scheme and now look forward to this activity becoming business as usual should the need arise.”
Neil Fitzsimons, Power On Connections. 

We are always keen to assist ICPs to be able to compete more effectvely in the connections market. The scope of market activites is important to ICPs if they are to increase  market share.

Metered disconnections are currently a non-contestable activity and therefore not open to competition. We were asked if we would be willing to allow ICPs to undertake metered disconnections, which led us to include two actions in our 2016/17 work plan; to run a pilot with an ICP to carry out metered disconnections and then to consider implementing an enduring business process to allow ICPs to carry out this work when required.

We worked with Independent Connections Provider Power On Connections, to develop all the necessary business processes; identify appropriate projects and carry out pilot disconnections works. The pilot was a success with Power On Connections undertaking a three phase metered service disconnection. As a result of this pilot, we have been able to prove that suitably accredited ICPs are capable of carrying out this work and therefore we see no reason why this activity should not be opened up to competition.

Following on from the initial pilot we now have the business as usual processes in place that allows us to process an enquiry from a suitably accredited ICP to undertake a single or three phase whole current metered disconnection. However, interest from ICPs since the pilot remains limited at this time. Having gained valuable experience from the pilot and accordingly, should ICPs want to extend their activities into metered disconnections then we are now able to service their future needs.  

View timeline
BACK TO TOP
footer-logo
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2025

Cookie settings