Skip to main content
  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexibility Services
    • Green Recovery
    • Transmission Interface
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Innovation
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Partnership Working
    • Northern Powergrid Foundation
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Health and Safety
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Independent Stakeholder Group
    • DSO Review Panel
    • Digitalisation and Action Plan
    • Blogs
  • News
  • Careers

Login

Login to online services

We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

Login Menu
  • Connections
  • Cut Outs
  • Independent Point of Connection
  • Earth Requests
  • Disconnections
  • Moving our Equipment
  • Enquiries
  • Safety Advice
  • SafeDig
  • Shrouding
  • Service Alterations
Northern Powergrid Homepage
  • My power is off
  • New connections
  • Existing connections
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Independent Stakeholder Group
    • Distribution System Operation
    • DSO Review Panel
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Partnership Working
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Northern Powergrid Foundation
    • Open Data Portal
    • New Power Generation
    • Safety
    • Services Directory
    • Smart Metering
    • Transmission interface
    • Weather Aware
  • Power cuts
  • New Connections

    New Connections

    Information

    • Battery Storage
    • EV Charging Points
    • Energy Storage Systems
    • Generation
    • Heat Pumps
    • Independent Point of Connection
    • New Connection
    • Solar Panels
    • Street Furniture (metered)
    • Street Furniture (unmetered)
    • Temporary Connection
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions
  • Existing connections

    Existing Connections

    Information

    • Battery Storage
    • Change Capacity
    • Disconnections
    • Energy Storage Systems
    • EV Charging Points
    • Generation
    • Heat Pumps
    • Move Equipment
    • Solar Panels
    • Street Furniture Changes
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions

    If you are an organisation that installs low carbon technology in residential premises that have an existing connection, you can use ENA Connect Direct. It’s a new, faster way to get approval to connect residential low-carbon technology to the grid.

  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    Login to online services

    We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

    Login Menu
    • Connections
    • Cut Outs
    • Independent Point of Connection
    • Earth Requests
    • Disconnections
    • Moving our Equipment
    • Enquiries
    • Safety Advice
    • SafeDig
    • Shrouding
    • Service Alterations
  • Search
Connections Offer Expenses
31/12/2021
30/04/2021
31/12/2021
Objectives completed

As of 31st December we completed work on this activity and achieved the following outcomes.

We engaged with our stakeholders to help them understand how, when and why our Connection Offer Expenses are applied
30/04/2021

Connections Offer Expenses

Action
We will engage with stakeholders on our Connection Offer Expenses (COE).
The Outcome
Stakeholders will be better informed about our COE including how, why and when they are applied..
Target Measure
Stakeholder updates delivered. CoE guide and webpage updated.
Voltage
LV
HV
EHV
RAG Status
Complete
Market Segments
M
U
DG
ICP

We will engage with stakeholders on Connection Offer Expenses (COE).

In 2018, all DNOs introduced COE fees (also known as Assessment & Design or A&D fees) to drive efficiencies in the connection process and ensure fairer allocation of costs.

We charge a COE fee for the budget estimates, feasibility studies and quotations we produce for our large works connections customers. We only recover the costs that we have reasonably incurred when completing the detailed design work required to produce these offers and we do not make a profit on the COE fees we charge.

We understand however that the differences in the way DNOs charge for COE can be confusing and so we have been engaging with stakeholders to help them understand how, why and when our fees are applied.

Our COE fees remained unchanged for more than three years. In July 2021, we updated our COE as part of an annual review we undertake to ensure our fees remain cost-reflective of the services we provide. As part of this, we updated our guide and  webpage to reflect the new COE fees and latest information. We wrote to more than 6,000 connections stakeholders to inform them of the change and the reasons for our decision and published an open letter on our website. We also set up a dedicated email address so that customers who had questions about the new COE fees or how they had been applied would receive a timely response. 

To find out more visit www.northernpowergrid.com/connection-offer-expenses

View timeline
BACK TO TOP
footer-logo
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2025

Cookie settings