Skip to main content
  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexibility Services
    • Green Recovery
    • Transmission Interface
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Innovation
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Partnership Working
    • Northern Powergrid Foundation
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Health and Safety
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Independent Stakeholder Group
    • DSO Review Panel
    • Digitalisation and Action Plan
    • Blogs
  • News
  • Careers

Login

Login to online services

We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

Login Menu
  • Connections
  • Cut Outs
  • Independent Point of Connection
  • Earth Requests
  • Disconnections
  • Moving our Equipment
  • Enquiries
  • Safety Advice
  • SafeDig
  • Shrouding
  • Service Alterations
Northern Powergrid Homepage
  • My power is off
  • New connections
  • Existing connections
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Independent Stakeholder Group
    • Distribution System Operation
    • DSO Review Panel
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Partnership Working
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Northern Powergrid Foundation
    • Open Data Portal
    • New Power Generation
    • Safety
    • Services Directory
    • Smart Metering
    • Transmission interface
    • Weather Aware
  • Power cuts
  • New Connections

    New Connections

    Information

    • Battery Storage
    • EV Charging Points
    • Energy Storage Systems
    • Generation
    • Heat Pumps
    • Independent Point of Connection
    • New Connection
    • Solar Panels
    • Street Furniture (metered)
    • Street Furniture (unmetered)
    • Temporary Connection
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions
  • Existing connections

    Existing Connections

    Information

    • Battery Storage
    • Change Capacity
    • Disconnections
    • Energy Storage Systems
    • EV Charging Points
    • Generation
    • Heat Pumps
    • Move Equipment
    • Solar Panels
    • Street Furniture Changes
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions

    If you are an organisation that installs low carbon technology in residential premises that have an existing connection, you can use ENA Connect Direct. It’s a new, faster way to get approval to connect residential low-carbon technology to the grid.

  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    Login to online services

    We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

    Login Menu
    • Connections
    • Cut Outs
    • Independent Point of Connection
    • Earth Requests
    • Disconnections
    • Moving our Equipment
    • Enquiries
    • Safety Advice
    • SafeDig
    • Shrouding
    • Service Alterations
  • Search
06/11/2018
31/10/2018
06/11/2018
Objectives completed

As of 6th November we completed work on this activity and achieved the following outcomes.

31/10/2018

New EV connections

Action
We will engage with those stakeholders who are interested in new EV connections by delivering a minimum of two dedicated engagement sessions.
The Outcome
Stakeholders will be better informed about our approach to EV connections and our associated processes.
Target Measure
Two engagement sessions held.
Voltage
LV
RAG Status
Complete
Market Segments
M
U

We will engage with stakeholders interested in new EV connections and hold a minimum of two engagement sessions.

Decarbonising the energy system and the electrification of everything from vehicles to heating, is an important step on the journey towards achieving the UK target of net zero emissions by 2050.

We are committed to supporting the electrification of transport in a way that minimises the need for new network infrastructure and reinforcement and delivers maximum value for our customers.

We set out our plans in our ‘Maximising the value of electric vehicles for our customers’ EV readiness document that was published last year and have continued to engage with stakeholders on the steps we are taking to support and accelerate the uptake of EVs.

The first dedicated engagement event we hosted was a webinar in October 2019 and more than 140 stakeholders registered to take part. We used this webinar as an opportunity to discuss our role in the low carbon transition and explore current EV uptake and future projections. We talked about the new commercial and technical solutions we are developing and explained how we can support our stakeholders in achieving their net zero targets. When participants were asked if the webinar had improved their understanding of what we are doing
to support the electrification of transport in our region, 77% of those
who responded agreed it had, 14% were neutral and 9% disagreed.

Our second engagement event took place in February 2020. This took the form of a workshop and was attended by a range of stakeholders, including local government representatives, consultants, installers, Community Energy stakeholders and other interested parties. As part of the feedback, 81% of those who responded said they found the workshop ‘very useful’ or ‘useful’, the remaining 19% were neutral, such that no-one was dissatisfied with the experience.

As the UK continues its transition towards a fully decarbonised transport system, we will continue to play our part, hosting engagement events that focus on how we are supporting the continued uptake of EVs and other low carbon technologies.

  • Our ‘Maximising the value of electric vehicles for our customers’ report is available here
  • A recording of our webinar is available on our YouTube channel at youtube.com/user/NorthernPowergrid
View timeline
BACK TO TOP
footer-logo
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2025

Cookie settings