Skip to main content
  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexibility Services
    • Green Recovery
    • Transmission Interface
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Innovation
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Partnership Working
    • Northern Powergrid Foundation
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Health and Safety
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Independent Stakeholder Group
    • DSO Review Panel
    • Digitalisation and Action Plan
    • Blogs
  • News
  • Careers

Login

Login to online services

We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

Login Menu
  • Connections
  • Cut Outs
  • Independent Point of Connection
  • Earth Requests
  • Disconnections
  • Moving our Equipment
  • Enquiries
  • Safety Advice
  • SafeDig
  • Shrouding
  • Service Alterations
Northern Powergrid Homepage
  • My power is off
  • New connections
  • Existing connections
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Be Prepared
    • Customer Service
    • Customer Welfare
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Independent Stakeholder Group
    • Distribution System Operation
    • DSO Review Panel
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Partnership Working
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Northern Powergrid Foundation
    • Open Data Portal
    • New Power Generation
    • Safety
    • Services Directory
    • Smart Metering
    • Transmission interface
    • Weather Aware
  • Power cuts
  • New Connections

    New Connections

    Information

    • Battery Storage
    • EV Charging Points
    • Energy Storage Systems
    • Generation
    • Heat Pumps
    • Independent Point of Connection
    • New Connection
    • Solar Panels
    • Street Furniture (metered)
    • Street Furniture (unmetered)
    • Temporary Connection
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions
  • Existing connections

    Existing Connections

    Information

    • Battery Storage
    • Change Capacity
    • Disconnections
    • Energy Storage Systems
    • EV Charging Points
    • Generation
    • Heat Pumps
    • Move Equipment
    • Solar Panels
    • Street Furniture Changes
    Toolkit and Information Menu
    • Common Charging Methodology Yorkshire Plc
    • Common Charging Methodology Northeast Plc
    • Generation connection guide
    • Guide prices and timescales
    • Guide to connections services
    • Network Data
    • Open Data Portal
    • Payments
    • Transmission Interface
    • You have a choice
    • Connection offer Terms & Conditions

    If you are an organisation that installs low carbon technology in residential premises that have an existing connection, you can use ENA Connect Direct. It’s a new, faster way to get approval to connect residential low-carbon technology to the grid.

  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    Login to online services

    We offer a range of online services. To find out more, visit our services directory or  help and advice directory pages.

    Login Menu
    • Connections
    • Cut Outs
    • Independent Point of Connection
    • Earth Requests
    • Disconnections
    • Moving our Equipment
    • Enquiries
    • Safety Advice
    • SafeDig
    • Shrouding
    • Service Alterations
  • Search
Local Authority engagement
31/03/2022
30/04/2021
31/03/2022
Objectives completed

As of 31st March we completed work on this activity and achieved the following outcomes.

30/04/2021

Local Authority engagement

Action
We will host regular engagement sessions with Local Authorities to support their pipeline of connections projects and discuss their long term strategic development plans
The Outcome
Local Authority stakeholders will have a channel to discuss their immediate connections requirements and longer term strategic plans.
Target Measure
Invitations issued to all Local Authorities in our region. Minimum of four engagement sessions held.
Voltage
LV
HV
EHV
RAG Status
Complete
Market Segments
M
U
DG

We hosted regular engagement sessions with Local Authorities to support their pipeline of connections projects and discuss their long term plans.

Engagement with local stakeholders regarding the national Green Recovery Scheme that will see us unlock some £53m in accelerated network investment in the remainder of the RIIO-ED1 period revealed an opportunity for on-going engagement with Local Authorities and Local Enterprise Partnerships (LEPs).

With Local Authorities in our region setting ambitious net zero targets, as early as 2030 in some cases, they are increasingly looking to us for advice and to support them in achieving their decarbonisation goals.

We issued a call for evidence for the Green Recovery Scheme. We offered short 20 minute surgery sessions and were inundated with responses from Local Authorities and LEPs who wanted to discuss both their immediate requirements and longer-term strategic plans with us. This information helped inform our thinking on where network capacity could be best utilised.

We recognised the benefit of continuing these discussions, both for us and our stakeholders. Having early visibility of their pipeline of connections projects means we can manage the application and delivery process more effectively. Our Local Authority and LEP stakeholders will also benefit from better information, closer relationships and upfront advice to identify the most viable connection options.

We ran regular engagement sessions and invited all Local Authorities and LEPs in our region to take part. Stakeholders were able to book a one-to-one appointment to discuss any upcoming connection projects or their longer-term plans and ensured we had the right team is in place to support those discussions.

View timeline
BACK TO TOP
footer-logo
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2025

Cookie settings