APPLICATION FORMS
- Point of Connection Application Form
- Requote Application Form
- Request for Connection Project Call Off Form
- Design Approval Application Form
- ICP Small Works Matrix Self Determined Point of Connection Application Form - Metered
- ICP Small Works Matrix Self Determined Point of Connection Application Form - Unmetered
- Self Determined Point of Connection Notice Form
- Novation Information Request
- ICP Daily Whereabouts Form
- Acceptable As-Laid Standards
All applications should be returned to [email protected]
TECHNICAL DOCUMENTATION AND SPECIFICATIONS
- Request for Connection Project Call Off Form
- OHL ratings
- Cable Ratings and Impedance
- Eq Cable Lengths for Metered Connections
- Eq Cable Lengths for Unmetered Connections
- 11kV, 315-1000kVA UDE in Masonry Enclosure (ICP) Drawing No C1065233
- 11kV, 315-1000kVA UDE In Prefabrication Enclosure (ICP) Drawing No C1065253
- 11kV DNO Ring Direct Coupled IDNO Transformer Drawing No C1065235
- 20kV Distribution Substation in Prefabrication Enclosure (ICP) Drawing No C1065716
- 20kV Distribution Substation in Masonry Enclosure (ICP) Drawing No C1065717
- On-Site Commissioning Test Sheet SCTS 71 – HV Metering Equipment Tests
- On-Site Commissioning Test Sheet SCTS 81 – LV Metering Equipment Tests
- On Site Commissioning Test Sheet 82
- DOC06W Deed of Grant Underground with Adoption Date
- DOC08W Accommodation Complete with Adoption Date
- DOC08W Site Underground Lines with Adoption Date
- Site Quality Assurance Inspection Regime for Connections Extension Assets - May 2024
- On-Site Commissioning Test Sheet SCTS 71 – HV Metering Equipment Tests
- On-Site Commissioning Test Sheet SCTS 81 – LV Metering Equipment Tests
- Code of Practice for Point of Connection Assessment using Standard Design Rules for New and existing Low Voltage Connections up to 60kVA
- Code of Practice for Underground Cable Ratings and Parameters
- Code of Practice for Overhead Line Ratings and Parameters
CODES OF PRACTICE, POLICIES AND WAYLEAVES
- Competition in Connections Code of Practice
- Northern Powergrid Wayleave Agreement Yorkshire
- Northern Powergrid Wayleave Agreement North East
- Low Voltage Safety Rules
- HAS 042 001 v3.0 - Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance
- NPS/003/004 Northern Powergrid assessed 33kV switchgear products
- NSP 007 020 v2.0 - Guidance on Substation Design Transformer Noise
- NSP 007 028 Design Submission Requirements
- 33kV Connection Design Information
- IDNO Incorporated Rights General Agreement Form
- VSOP for Legal Process for Development Sites
- VSOP for the Legal Process for Incorporate Rights
GUIDANCE
- Simplifying Competition in Connections Guide
- Assessed Product Database
- ICP Design Approval and Inspection Dispute Escalation Process
- Link Box Installation Guidance Document for IDNOs and ICPs - V1 July 2024
- MPAN Generation CiC Process for ICPs
- Competition in Connections Process Flow Diagrams
- ICP/IDNO Land Rights Guide
- Completion Handover and Adoption Certificate
- NPg Asset Recording Guidance for ICP/IDNOs
- Distribution Safety Rules 2015
- NPg Design Demand Calculator
- Schedule of Contestable Input Services – September 2023
- Self Determination of Point of Connection and Self Design Approval Tables
- Authorisation Options Guidance Document
- Design Inspection Levels
- Operational Practice Manual
- SLC15 Standards and Voluntary Payments
- SLC15 Minimum Information Requirements
- Common Connection Charging Methodology (CCCM) Statements Yorkshire PLC
- Common Connection Charging Methodology (CCCM) Statements Northeast PLC
- Competition in Connections - Process Flows